PERT AND LOB SIMPLIFIED INTEGRATED MODEL FOR DETERMINING PROBABILISTIC SCHEDULING OF REPETITIVE PROJECTS

Abstract

 In a construction project environment there is always a risk or chance that adverse conditions could occur, which may cause the project to fail, or couldn’t meet its planned objectives. The importance of planning and time scheduling has emerged in the last decade and it becomes an essential step for any construction project to reduce this risk. The project schedule should reflect all of the work associated with delivering the project on time. Without a full and complete schedule, the project manager will be unable to communicate the complete effort, in terms of cost and resources, necessary to deliver the project. Most current methods of time schedules and estimating have been converted to software programs in order to be easy to be used by planners and to avoid manual mistakes. Presently, experts in the fields of time planning are searching for better software they can depend on, that is more powerful, easier and serves different kinds of projects. This paper develops software that is essential for improving time planning and estimating for projects that repeat linearly and focuses on features of PERT and LOB for calculating expected completion probability of any repetitive construction project within a specified end date. The software is designed by EXCEL spreadsheet system to provide the factors that affect projects end date probability. At the end, illustrative cases of study are presented to validate and verify the proposed software.

Authors and Affiliations

Sherif M. Hafez*,

Keywords

Related Articles

 MECHANICAL PROPERTIES OF BAMBOO REINFORCED EPOXY COMPOSITES WITH DIFFERENT SIZES OF BAMBOO POWDER

 Uses of natural fibres as reinforcement have gained the importance in the recent years due to the eco-friendly nature. These natural fibres offer a number of advantages over traditional synthetic fibres. This pape...

 THE DISCREPANCY OF THE STUDENTS’ MATHS ACHIEVEMENT BASED ONTHE COMBINATION OF COOPERATIVE LEARNING MODEL, STUDENTS’CHARACTERS BEHAVIOUR, AND EDUCATION LEVEL (EXPERIMENTALSTUDY ON THE STUDENTS OF SENIOR AND JUNIOR HIGH SCHOOLS INKENDARI

 This 3x3x2 factorial-designed experimental study aims at analysing the discrepancy of students’ Mathsachievement based on the combination of cooperative learning model (Jigsaw-STAD, TSTS-STAD and STAD),the students...

 A REVIEW ON SECURE DATA TRANSMISSION USING CRYPTOGRAPHIC TECHNIQUES

 The ability to protect and secure information is vital to the growth of electronic commerce and to the growth of the Internet itself. Many people need or want to use communications and data security in different ar...

 THEORETICAL DEVELOPMENT OF RICE TRANSPLANTING MACHINE

 As in India, the plantation cost is increasing day by day. As such time the efficiency of production is decreases. One of the reason behind this is the cost of labourship, availability of labours and the expen...

Architectural Overview of Delay Tolerant Network

This paper discuss about the current design of the Delay/Disruption Tolerant Networking (DTN) Architecture and also deals with some open issues regarding the architecture. At present we had achieved some stability with...

Download PDF file
  • EP ID EP89921
  • DOI -
  • Views 119
  • Downloads 0

How To Cite

Sherif M. Hafez*, (0).  PERT AND LOB SIMPLIFIED INTEGRATED MODEL FOR DETERMINING PROBABILISTIC SCHEDULING OF REPETITIVE PROJECTS. International Journal of Engineering Sciences & Research Technology, 4(9), 109-118. https://europub.co.uk./articles/-A-89921