A Genetic Algorithm for Resource Contrained Project Scheduling Problem

Abstract

Resource constrained project scheduling in a well know NP hard problem of Operation Research which has attracted a lot of research in last decade. This paper deals with a metaheuristic methodology for solving a RCPSP (Resource Constrained Project scheduling Problem) and makes use of Genetic Algorithm with an objective of minimizing the makespan of the project schedule. Problem Instances of PSPLIB were solved and % Average Deviation was calculated.

Authors and Affiliations

Shaikh Shadab Anwar, Dr. V. S Bilolikar

Keywords

Related Articles

Our Future: Artificial Intelligence, Expert Systems & Robots

Artificial Intelligence is the concept of computer science which deals with building computers that exhibits the intelligent behaviour like us. In other words it concern with making intelligent machines which having abi...

Industrial Conflict: Conflict Necessary For Creativity

In today’s business scenario organizations are facing a major issue in the form of Conflict which requires attention. Conflict can be functional or dysfunctional. Functional conflict is for improvement whereas Dysfuncti...

Home Automation and Energy Management Using Smart Phone

This paper is about the prototype project of design and implementation of wireless remote control system for automation of home appliances and energy management using smart phone. In this system microcontroller remotely...

Present Scenario of Architecture Education In India

This paper takes an overview of the present scenario of Architecture Education in INDIA. Sidney Hook defines education as “assimilation of the culture of any society, and its transmission from one generation to another,...

Optimal Design of Low Pass Filter By Parzen, Taylor and Hamming Technique

Digital filtering plays a significant role in the world of technology. Therefore, processing of input signal has to be done to get useful signal. This paper deals with the design of finite impulse response digital filte...

Download PDF file
  • EP ID EP22625
  • DOI -
  • Views 227
  • Downloads 4

How To Cite

Shaikh Shadab Anwar, Dr. V. S Bilolikar (2016). A Genetic Algorithm for Resource Contrained Project Scheduling Problem. International Journal for Research in Applied Science and Engineering Technology (IJRASET), 4(9), -. https://europub.co.uk./articles/-A-22625