A METHODOLOGY OF MODELLING THE STRESS-STRAIN STATE OF RIGID CONNECTION JOINTS OF SITECAST REINFORCED CONCRETE CEILING TO CONCRETE FILLED TUBE COLUMN
Journal Title: Вісник Національного університету "Львівська політехніка". Серія "Теорія та практика будівництва" - Year 2018, Vol 0, Issue 888
Abstract
The methodology of modeling the stress-strain state of rigid connection joints of sitecast reinforced concrete ceiling to concrete-filled column was developed. The construction of ceiling include the external steel reinforcement plates, which works as ceiling-height beams and steel rigid element, which crosses the concrete filled tube core and allows to transfer the loads from the ceiling on the concrete filled column. The modeling was done with the Femap (NX Nastran) software package, using the geometry models, created in the Autocad graphic environment. An edge loads for the rigid connection joint of steel elements of sitecast reinforced concrete ceiling to concrete-filled column was taken from the model of a 40-floor building with the 6m column step, which was modeled in Lira software package. The bending moment from the ceiling was attached as a distributes pair of forces to the flanges of the external steel ceiling reinforcement plates and the shear force was attached to the steel web of an internal rigid element. As a result of modeling the stress-strain state of rigid connection joints of steel elements of sitecast reinforced concrete ceiling to concrete-filled column, the diagrams of the stress and strain distribution were received. The diagrams of the stress and strain distribution allowed researchers to determine the joint elements working conditions and stress concentrations. The maximum stresses were occurred in the web of the internal rigid element and in the corners of the top flanges of the external steel ceiling reinforcement plates. The analysis of the stresses in the rigid connection joint of steel elements of sitecast reinforced concrete ceiling to concrete-filled column finite element model allowed researchers to optimize the joint with the external stiffeners creation, which allowed to increase the overall connection stiffness. The concrete filled and non-concrete filled tube models comparison was made to receive the concrete filled column core bearing conditions. According to the results of comparison modeling, the concrete core of concrete filled column is included in the column work and bear the 55–60 % of ceiling load.
Authors and Affiliations
Volodymyr Kushchenko, Y. Halushchak
НОВА КОНСТРУКТИВНА ФОРМАЖОРСТКОГО З’ЄДНАННЯ МОНОЛІТНОГО ЗАЛІЗОБЕТОННОГО ПЕРЕКРИТТЯ З ТРУБОБЕТОННОЮ КОЛОНОЮ
Basing on existent concrete filled tube to reinforced concrete ceiling joining constructive form research and investigation in reinforced concrete area analyzing, the new constructive form of rigid connection of concrete...
МІЦНІСТЬ ЗАЛІЗОБЕТОННИХ БАЛОК, ПІДСИЛЕНИХ ПОПЕРЕДНЬО НАПРУЖЕНОЮ АРМАТУРОЮ
This article describes strengthening normal cross-section of reinforced concrete beams with prestressed reinforcement under load. The samples of RC beam with 2100 mm. length, 100 mm width, and 200 mm height was tested. A...
NUMERICAL ANALYSIS OF STEEL FRAME SUBJECTED TO AIR BLAST
The paper focuses on the numerical analysis of steel frame subjected to air blast load. ABAQUS/Explicit was employed to establish 3D finite element model. Two-storey steel frame was discretized with solid elements. Air b...
Інвестиційний проект реконструкції каналізаційних очисних споруд та будівництва станції виробництва біогазу у м. Львові
This article describes the results of the technical and economic calculations and analysis of the economic efficiency of the project of reconstruction of waste water treatment plant. Lviv and construction of biogas plant...
Особливості вертикальної гідроізоляції стін із кремнійорганічних рідин та сумішей на їх основі
This article presents the results of a study liquids production ZDP “Kremniypolimer” for their application for obtaining or renewal of vertical waterproofing by surface impregnation and waterproofing during repair work t...