Analysis of Overall Equipment Effectiveness in Fanuc Line 1 Machines by Minimizing six big losses

Journal Title: Journal of Sustainable Engineering: Proceedings Series - Year 2019, Vol 1, Issue 2

Abstract

The company produces several automotive components in Karawang. For the production process using Fanuc machines on Line1, but the results of evaluating the performance of the engine Fanuc Line1 engine effectiveness is not optimal. It was alleged that due to the planning and maintenance of the management machinery was not good, so that the frequency of damage to the machine was still high, which gave the effect that the production was not achieved. For this reason, the effectiveness of the use of Fanuc line1 is done by using the Overall Equipment Effectiveness (OEE) method with the Six big losses calculation approach so that the level of efficiency can be known. The results showed that the magnitude of the OEE value on Fanuc line1 machines in April – August 2018 amounted to 78.82%, this value is still below the JIPM standard of 85%. The amount of Losses is influenced by reduced speed loss of 57.47% and breakdown loss of 22.79%.

Authors and Affiliations

Sukanta , Burhan N. , Setiawan , Dessy Agustina Sari

Keywords

Related Articles

Analysis of Overall Equipment Effectiveness in Fanuc Line 1 Machines by Minimizing six big losses

The company produces several automotive components in Karawang. For the production process using Fanuc machines on Line1, but the results of evaluating the performance of the engine Fanuc Line1 engine effectiveness is no...

Flood disaster mitigation concept of settlements in Sario watershed area

There are five large rivers which pass through and empties into Manado City, one of them is the Sario River. In 2014, the settlements around the Sario watershed area was severely damaged due to flash floods, in fact, the...

Design System Energy Sustainable Using Wind Turbine For Public Fish Cages Lightning at Belang Village in Southeast Minahasa

These paper present the designing system of wind turbine for public fish cages lighting at Belang Village in Southeast Minahasa. Belang is one of popular destination to find a fresh fish in north sulawesi, but the proble...

Identifying Students' Pre-Classroom Behaviors in a Flipped Learning Environment

Advancements in Information Technology have lead the world to new ways of life including in the education field. Nowadays we have various types of computer and Internet-assisted learning. With the booming of blended lear...

Effects of Coconut Sawdust on Mechanical Properties and Porosity of Concrete Mixtures

The presence of coconut sawdust in North Sulawesi is very potential to be utilized as an alternative material for application in construction field. This paper aims to investigate experimentally the effect of coconut saw...

Download PDF file
  • EP ID EP639096
  • DOI 10.35793/joseps.v1i2.22
  • Views 85
  • Downloads 0

How To Cite

Sukanta, Burhan N. , Setiawan, Dessy Agustina Sari (2019). Analysis of Overall Equipment Effectiveness in Fanuc Line 1 Machines by Minimizing six big losses. Journal of Sustainable Engineering: Proceedings Series, 1(2), 164-173. https://europub.co.uk./articles/-A-639096