Application of Tower Girder Asynchronous Construction Technology
Journal Title: Smart Construction Research - Year 2018, Vol 2, Issue 4
Abstract
When constructing the tower beam in a traditional way, the tower beam will be simultaneously constructed with the tower column, it asks for a complicated construction procedure, difficult construction organization, long operating cycle, and highly increased construction cost. With the progress of technology, Asynchronous construction scheme of the tower column and tower beam is adopted and applied. This paper is based on the case of asynchronous construction of the H-type cable tower and beam of the six large-span Ao jiang Bridges .
Authors and Affiliations
Xiao Li, Qiantu He
Bending and Vibration Analysis of Curved FG Nanobeams via Nonlocal Timoshenko Model
The bending and vibration behavior of a curved FG nanobeam using the nonlocal Timoshenko beam theory is analyzed in this paper. It is assumed that the material properties vary through the radius direction. The governing...
Vigorously develop PMC business, speed up the transformation of the design institute
This paper discusses the feasibility and advantages of PMC business in the design institute and puts forward that the design institute wants to realize the transformation and upgrading successfully and promote the realiz...
Research on construction site management of environmental protection engineering
With the improvement of the social and economic level, the quality of people's lives has been significantly improved, and environmental protection has gradually attracted people's attention. Environmental protection proj...
Discussion on construction methods and precautions of building water supply and drainage
As an important construction link in the construction project, the quality of the water supply and drainage directly affects the overall quality of the construction project. Because of the strong function of the water su...
Construction Progress Control And Management Measures Analysis
The construction schedule control of construction project is within the prescribed period of time to develop a scientific and reasonable plan, and when executed timely check construction progress, the knowledge of constr...