[b]Utilization Of Tower Cranes In Construction Of Multi[/b]

Abstract

Dams, Roads, Bridges, Buildings, Over head Water Tanks, Towers, High etc. The present paper deals with the material handling equipment involved in the construction of multistoried buildings / High-rise buildings where the manual handling is very difficult. The main equipment is TOWER CRANE. The utilization of Tower Crane in terms of manua effectiveness with that of manual handling. The findings have revealed that the Mechanical Handling time saving is 75 times than the manual work and the reduction in cost of labour times. Suggestions are made t improvement of the efficiency of the equipment

Authors and Affiliations

M. Sankaraiah

Keywords

Related Articles

 A Survey on Performance Analysis of AODV and DSR

 A Wireless network is a collection of autonomous mobile nodes that communicate with each other over wireless links without any fixed infrastructure. It is a method by which homes, telecommunications networks and...

 IDENTIFICATION OF GROUNDWATER RECHARGE ZONES AND ARTIFICIAL RECHARGE STRUCTURES FOR PART OF TAMIL NADU, INDIA - A GEOSPATIAL APPROACH

 Water is essential for the existence of all forms of life for human consumption, agriculture and industrial. This is the reason why the man has moved and settled only in areas of rich water resources. As the popul...

STUDY OF NOISE BEHAVIOR ON MUFFLERS FOR IC ENGINE: A REVIEW

The aim of this paper is to analysis the Muffler for four stroke diesel engine. Muffler or silencer is a device which is used for reducing the amount of noise emitted by the exhaust of an internal combustion engine. Af...

 Comparative study of PCA and ICA in the field of Data Reduction

 This paper presents the results of a comparative study of Pca and Ica in the field of data reduction. In particular, we compare the two feature extraction techniques- independent component analysis (ICA) and Princ...

A DATA GUIDED LEXI - SERACH APPROACH FOR TIME DEPENDENT TRAVELLING SALEMSMAN PROBLEM

A simple lexi - search algorithm that uses path representation method for the time dependent t raveling salesman problem TD TSP is proposed, to obtain exact optimal solution to the probl...

Download PDF file
  • EP ID EP101106
  • DOI -
  • Views 85
  • Downloads 0

How To Cite

M. Sankaraiah (30). [b]Utilization Of Tower Cranes In Construction Of Multi[/b]. International Journal of Engineering Sciences & Research Technology, 2(1), 1-8. https://europub.co.uk./articles/-A-101106