Calculation Method for Number of Battery Energy Storage Trams in Operation
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 2
Abstract
[Objective] To address the issues that the conventional method for calculating the number of VO (vehicles in operation) is not applicable to battery energy storage trams and the overly complex layout of train operation diagrams, a revised calculation formula for determining VO number is proposed. [Method] The conventional method for calculating VO number unaffected by charging is introduced. Based on this, taking the influence of tram charging process into account, a calculation method for determining VO number of battery energy storage trams that meets operational plan is proposed. Calculation assumptions are presented, and the calculation methods for various related parameters are described. Taking the VO number calculation of a battery energy storage tram line in a city as example, the proposed method is used to analyze the situation where the train goes off-line for charging after reaching the endurance mileage during on-line operation. [Result & Conclusion] The train operation process is divided into three stages: the concentrated on-line process before peak hours, the on-line train operation process, and the concentrated train off-line replacement and on-line supplement process. The calculated VO number has an error of approximately 5% compared to the results obtained through the layout of train operation diagram, indicating that the proposed method for calculating VO number can meet operational requirements with a certain margin.
Authors and Affiliations
Mengran ZHANG, Xiaohong FANG, Jingsong DUAN
Special Fire Protection Design for the Enlarged Stair and Escalator Public Area of a Subway Station
Objective With the continuous improvement of socio-economic situation, there are more and more special subway projects. Traditional fire protection codes and standards are difficult to meet the needs of some subway stati...
Operation Scheme for City Railway Train Considering Passenger Travel Time Value
[Objective] In view of the functional orientation of city railway and the inconsistency in passengers demand for travel convenience, ride comfort, and economy under the current economic and social development, it is nece...
Research on Circumferential Deformation of Metro Shield Tunnel Based on FBG Monitoring Technology
Objective FBG (fiber bragg grating) monitoring technology features fast dynamic response, strong anti-interference, high precision and strong durability, and can realize long-distance real-time monitoring. The feedback c...
Optimization of Mecca Light Rail Train Organization during Peak Hours Based on Virtual Formation Technology
Objective With the annual increase of pilgrim flow in Mecca, the throughput capacity of Makkah Metro Pink Line (simplified as Mecca light rail) operation plan during peak hours is saturated. Therefore, it is aimed to exp...
Stress Characteristics and Design Optimization of Shield Initial Reaction Frame in Confined Space
Objective The size of the reaction frame is strictly constrained in shield tunnel initial operation under limited space environment. In view of this, to ensure the frame can withstand the huge reaction force generated du...