Control Circuit Optimization for High-speed Circuit Breaker in Traction System of Jinan Metro Line 3

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 3

Abstract

[Objective] In the early operation stage of Jinan Metro Line 3, multiple sporadic high-speed circuit breaker closing failures are reported. To improve the reliability of train operation, it is necessary to optimize the high-speed circuit breaker control circuit in the traction system. [Method] According to the relevant closing command and the component status when a closure failure of the high-speed circuit breaker on Line 3 train occurs, and in accordance with the control logic principle of the high-speed breaker, the causes of the occasional closure failure are analyzed and the optimization measures are put forward. [Result & Conclusion] The causes of the occasional closure failure are that in the process of closure control of high-speed circuit breaker, the induced electromotive force generated at both ends of the high-speed circuit breaker coil makes the closing power insufficient, resulting in the failure closure of the breaker. The improvement measure is to connect freewheel diodes at both ends of the high-speed circuit coil to suppress the induced electromotive force generated by the above coil. With the above improvement measure, the closure failure of the high-speed circuit breaker caused by induced electromotive force never occurs again, and the reliability of train operation is effectively improved.

Authors and Affiliations

Xu ZHANG, Xianchao ZHAO, Yanna ZHAO

Keywords

Related Articles

Electromagnetic Field Analysis of Dual-power Traction Power Supply System in Rail Transit Depot under AC-DC Switching Power Supply Mode

Objective The AC-DC (alternating current-direct current) dual-power traction power supply system depot features densely distributed tracks and relatively close catenary clearance. Different power supply modes can affect...

Optical Power Prediction Method Based on Double Pooling Multilayer Perception

Objective In response to the situation where historical optical power data in metro communication systems is missing despite the sufficient historical related data, an optical power prediction method based on double pool...

Influence of Soft Soil Area River Excavation on Underlying Metro Tunnel Deformation and Control Measures

Objective The unloading-induced upheaval deformation resulting from river excavation above metro shield tunnels may affect metro tunnel normal operation. Therefore, it is necessary to study the deformation effects of sof...

Impact Analysis of New Shield Tunnel Under-passing Construction on Existing Railways

[Objective] The construction of new shield tunnels under-passing existing railway can cause deformation of the former railway subgrade. To ensure the stability and safety of the existing railway, appropriate reinforcem...

Influencing Factors and Control Effects of Targeted Grouting Technology for Underground-excavated Metro Station Construction

[Objective] In conventional grouting construction technology, the ineffective diffusion of grout is comparatively severe and leads to unsatisfactory reinforcement effects on surrounding rock and soil mass. Therefore, it...

Download PDF file
  • EP ID EP732820
  • DOI 10.16037/j.1007-869x.2024.03.046
  • Views 59
  • Downloads 0

How To Cite

Xu ZHANG, Xianchao ZHAO, Yanna ZHAO (2024). Control Circuit Optimization for High-speed Circuit Breaker in Traction System of Jinan Metro Line 3. Urban Mass Transit, 27(3), -. https://europub.co.uk./articles/-A-732820