Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 11
Abstract
Objective During the evolution of existing DCS (data communication subsystem) towards a dual-mode four-network system in the major signaling system renovation project of Shanghai Rail Transit Line 3 and Line 4, there is a hidden risk that the trackside DCS single-point fault may cause the failure of individual vehicle-wayside communication network. It is needed to optimize DCS reliability through adjusting the communication network structure. Method Based on TACS (train autonomous circumambulate system) structure and operation context, the DCS network structure is analyzed to identify key nodes and links affecting DCS reliability. The optimization scheme for DCS reliability is elaborated from both device and protocol layers. Field tests of operating trains on a sample section in the optimized scheme are conducted to evaluate the reliability of DCS. Result & Conclusion The optimized DCS demonstrates high reliability, it significantly enhances the overall performance of signaling system.
Authors and Affiliations
Xin WANG
Electromagnetic Interference with the On-board Balise Transmission Module Antennas of Urban Rail Transit Train
[Objective] The electromagnetic environment of urban rail transit train is relatively complex. The on-board BTM (balise transmission module) antenna is highly susceptible to electromagnetic interference, which may easi...
Intelligent Analysis System for Turnout Friction Current Based on Density Clustering Algorithm and Breadth-first Search Algorithm
Objective The turnout friction current on-site testing and adjustment involve three major unfavorable aspects of complex processes and high risks, high professional requirements for maintenance personnel, and significant...
Sonar Detection and Comprehensive Treatment of Water Inrush Disaster for Metro Station Deep Foundation Pit in Complex Karst Strata
Objective In Foshan Area, due to the specific characteristics of the complex karst stratum, the calcareous siltstone stratum and the fracture zone can easily cause water inrush disaster in metro station foundation pit. T...
Construction Technology for Shield Tunnelling Under-passing in Proximity to Operation Metro Tunnels in Water-rich Pebble Stratum
Objective In the process of shield construction under-passing the existing metro line in water-rich pebble stratum, irregular settlement of the overlying soil mass beyond control range may occur, potentially leading to i...
Research on the Impact of Wheel Polygonalization on Metro Bogies
Objective The objective is to investigate the impact of wheel polygonalization on metro bogies, thereby strengthening the control requirements for wheel polygonalization, and enhancing the operational quality and safety...