Delay Study in the Construction Project: An Overview

Abstract

“Scheduling” is the word when it came in our mind it means the time table and most important thing is that, works should be done in time, but even if we try everything to keep our time table in schedule some of the factors that cause us late by increasing our time, they are called “DELAY FACTOR” and the time increase by them, known as “DELAY”. DELAY is the factor which is responsible for every other factors which cause lose of time, money etc. especially the most prominent loss of time and money causes by delay factors is in construction. Today construction growth in the world is increasing day by day. In every part of the world an ongoing construction can be seen, so it is very important to keep every construction on time, but quite often it is not possible because many sub-factors from different main factors cause delay and keep the construction behind the time in comparison of schedule time. The main focus of this paper is to determine the current and most responsible Delay factors by methods of MCDM and by arranging and listing them, with the recommendation to minimizing them.

Authors and Affiliations

Shubham Sharma, Mukesh Pandey, Sohit Agrawal

Keywords

Related Articles

Textiles for protection against Electromagnetic Radiations: A review

Increased use of electronic devices creates a need to protect a present generation from the harmful effects of electromagnetic radiations. This review paper discuss about different textile materials that have been explor...

Numerical Investigation Of Parabolic Leaf Spring For Composite Materials Using Ansys

The purpose of the present investigation is to reduce the stress acting in the parabolic leaf spring in order to reduce the vibration of the vehicle. It can be achieved by choosing suitable composite materials e-glass/ep...

Determination of Concentrations of Selected Heavy metals in Cow’s Milk: Dodoma Urban District, Tanzania

Fresh cow’s milk samples were collected from five villages Chihanga, Msalato, Mtumba, Ntyuka and Chigongwe of Dodoma district, Tanzania, and preserved in a deep freezer (-20oC). The milk samples were digested by hot plat...

Some Fixed Points Theorems

In this research paper we have proved a fixed point theorem by taking a function to be an upper semi-continuous function from right. This theorem uses a function from the set of all positive real numbers to itself. Thus...

A Survey on Efficient Algorithm for Mining Top-k High Utility Itemsets

High utility thing sets (HUIs) mining is a rising subject in information mining, which alludes to finding all thing sets having an utility meeting a client determined least of utility edge min_util. Not with standing, se...

Download PDF file
  • EP ID EP391527
  • DOI 10.9790/9622-0707012123.
  • Views 110
  • Downloads 0

How To Cite

Shubham Sharma, Mukesh Pandey, Sohit Agrawal (2017). Delay Study in the Construction Project: An Overview. International Journal of engineering Research and Applications, 7(7), 21-23. https://europub.co.uk./articles/-A-391527