DETERMINATION OF THE BASIC PARAMETERS OF THE TECHNOLOGY FOR PREVIOUS ORE DRESSING IN QUARRIES AND THEIR INFLUENCE ON THE WORK OF MINING COMPLEX

Abstract

Purpose. To determine the basic parameters of the technology for dressing of ore in quarries and their impact on the work of the ore mining and processing enterprise. Methodology. Synthesis of research results using computer simulation methods has been used. Findings. The determined volume and sequence of works is necessary for the introduction of the technology of non-ore dressing in deep iron ore quarries. It has been substantiated that it is economically expedient to use the technology of ore pre-dressing in a quarry in a complex with cyclic-streaming technology. It has been proved that the cargo flows of ore become dependent on the complex dressing. As a result, after the previous dressing, there are additionally two elementary traffic flows (industrial product and tails). The peculiarities of freight traffic formation, the impact of freight transport communication, compatibility with the schemes of disclosure and systems of development, application of technological schemes and pre-dressing complexes have been substantiated. The results of analytical calculations concerning the application of the pre-dressing technology to the rocks of the disclosure of Petrovsky's career are presented. The calculations have shown that the removal of iron ores from the rocks reveals can reduce the loss of minerals by 5.3 times. This allows you to increase the production capacity of a career by 2.1-8.3% over the years, depending on the volume of dressing. Originality. For the first time, regularities have been established for changing the parameters of the stream of ore mass that enters the rocky complex of a complex geological structure, in terms of quality and fineness in relation to the parameters of the equipment of the technological complex of the quar-ry, which includes the dressing process. Practical value. Based on the established regularities, the influence of the productivity of the pre-dressing complex on the production capacity of the career, the productivity of the dressing plant and the overlapping work is substantiated. Conclusions. It has been proved that the technology of ore dressing in a quarries is energy-saving technology, as the total energy intensity of the process of dumping and processing per ton of final products decreases due to the improvement of the quality of mineral raw materials.

Authors and Affiliations

K. Babii

Keywords

Related Articles

RISKS ANALISYS AND MANAGEMENT OF WATER ECOSYSTEMS

Purpose. The functioning of the water ecosystem management system is characterized by the lack of a systematic approach to the analysis of the state of natural reservoirs, as well as the accurate and operative measuremen...

INFORMATION TECHNOLOGY TO SUPPORT THE PROCESS OF SUPPLYING GAS STATIONS WITH THE PETROLEUM PRODUCTS

Purpose. To increase the efficiency of planning the petroleum products supply to gas stations through developing mathematical models and methods that allow to allocate the resources taking into account the previous deman...

THE METHODOLOGICAL APPROACHES IMPROVEMENT OF ENVIRONMENTAL EFFICIENCY OF DRAINED LANDS NATURAL RECLAMATIVE REGIME EVALUATION CRITERIA

Purpose. The problem of optimization of the reclamation regime of the drainage lands, which determine the overall environmental and economic effects of implementation of measures to enhance their adaptive capacity in the...

HYDRAULIC CURTAINS TESTING FOR AIR PURIFICATION FROM HARMFUL CONTAMINANTS IN THE UNDERGROUND MINE OPENINGS

Purpose. To determine the technical parameters of water-air installation for formation of high pressure hydraulic curtains. Usage of this installation allows to realize an effective purification from harmful air cont...

MODIFICATION OF THE FORMS OF SERVICES PROVIDED BY HIGHER EDUCATION ESTABLISHMENTS

Purpose. The problems of the development of higher education are related to the activity of higher education establishments that are the basic link of the education process. The changes in the exter...

Download PDF file
  • EP ID EP659482
  • DOI 10.30929/1995-0519.2018.1.87-94
  • Views 62
  • Downloads 0

How To Cite

K. Babii (2018). DETERMINATION OF THE BASIC PARAMETERS OF THE TECHNOLOGY FOR PREVIOUS ORE DRESSING IN QUARRIES AND THEIR INFLUENCE ON THE WORK OF MINING COMPLEX. Вісник Кременчуцького національного університету імені Михайла Остроградського, 1(108), 87-94. https://europub.co.uk./articles/-A-659482