Determining The Contract Service Strategy at Coal Terminal Maintenance to Address Contractor’s Inability to Maintain Availability of Fixed Plants in Supporting Shipments Activities at PTKPC a Case Study PTKPC, East Kutai, East Kalimantan, Indonesia

Journal Title: International Journal of Current Science Research and Review - Year 2024, Vol 7, Issue 02

Abstract

PTKPC, a coal producer, was facing challenges due to a permit transition in December 2021 from Coal Mining Contract of Work (PKP2B) to Special Mining Business License (IUPK). This change increases operational costs with added royalty rates, value-added tax, and profit-sharing obligations. To address this issue, the company decided to streamline contractors in each department in all business units, consolidating various tasks under one umbrella contract. The goal is to provide a big volume of work, potentially lowering rates and reducing PTKPC’s operational costs. However, relying on a single contractor for crucial operations, as seen in the Coal Terminal Maintenance Department (CTMD), introduces risks. The sole contract winner, PTPB, struggles to meet obligations since the contract’s initiation on December 1, 2021. The average contract fulfillment since commencement date is 86% of 100% desired target, disrupting fixed plant Coal Terminal maintenance activities. Physical availability is 93%, below the 94% target, increasing CTMD’s maintenance costs by $0.059 per ton. This research seeks to identify the root causes of PTPB’s inability to fulfill contractual duties and explore alternative solutions. and then from all the existing alternatives, what is the best alternative in responding to this condition. Utilizing primary and secondary data from PTPB’s monthly proforma invoices, contract scope, and CTMD’s monthly reports, the research employs methodologies like problem tree analysis and stakeholder analysis to unravel business complexities and identify root cause of the problems. Qualitative data collection methods, including focused group discussions (FGD) and semi-structured interviews, will be used to determine alternatives. These alternatives will be assessed using the Value-Focused Thinking (VFT) methodology. The Analytic Hierarchy Process (AHP) methodology, assisted by the AHP Super Decision application, will determine the best alternative: the “Implementation of Warnings and Penalties to PTPB”. Implementing this alternative demonstrates PTKPC’s commitment to stakeholders, ensuring contractor accountability without disrupting fixed plant maintenance. Penalty funds will support CTMD’s financial viability, funding additional resources for tasks beyond PTPB’s capacity. This strategy may be applied to other contracts within PTKPC.

Authors and Affiliations

Akim Tua, Meditya Wasesa,

Keywords

Related Articles

Analysis of The Implementation of The Occupational Safety and Health Management System at Bhayangkara Kendari Hospital

Background: The occupational safety and health management system is part of the overall management system in the context of controlling work-related risks in order to create a safe, efficient and productive workplace. Th...

Development of Marketing Strategy to Improve AFX Market Penetration in Indonesia

In this paper, we examine the marketing strategy of AFX, a pseudonym for a real forex trading platform. This alias helps us discuss the company’s strategies without disclosing its identity. Our focus is on AFX’s efforts...

Response to Locomotive Syndrome in Japan

Locomotive syndrome is also known as “Locomo” and exercise organ syndrome. This disorder refers to disability resulting from daily physical activity, such as standing or sitting. The term Locomo appears to be used only i...

Analytical Hierarchy Process as a Priority Strategy for Handling Bad Debts in Cooperatives

The Kediri City Government and the Regional Development Planning Agency are committed to accelerating the economic recovery of the Kediri city community after the impact of the Covid-19 pandemic, by focusing on MSME capi...

A Study to Assess the Association between Malnutrition and Anemia in Underfive Children by Using two Binary Variables of Haemoglobin Crest and Low Height for Age and Low Degree of Malnutrition at Nerkundram

Background: Anemia, which is characterized by low level of hemoglobin in the blood, is one of the major public health hazards affecting people in both developed and developing countries. Anemia may occur at all stages of...

Download PDF file
  • EP ID EP729824
  • DOI 10.47191/ijcsrr/V7-i2-04
  • Views 52
  • Downloads 0

How To Cite

Akim Tua, Meditya Wasesa, (2024). Determining The Contract Service Strategy at Coal Terminal Maintenance to Address Contractor’s Inability to Maintain Availability of Fixed Plants in Supporting Shipments Activities at PTKPC a Case Study PTKPC, East Kutai, East Kalimantan, Indonesia. International Journal of Current Science Research and Review, 7(02), -. https://europub.co.uk./articles/-A-729824