deVelopINg a model to eNhaNce labor productIVIty uSINg brIdge coNStructIoN beNchmark data

Journal Title: Problems of Management in the 21st Century - Year 2013, Vol 7, Issue 7

Abstract

the Labor Working Status Monitoring (LWSM) Model that incorporates the WRITE and the industry benchmark data was developed through the fve steps to enhance labor producitivty in bridge construction operations. The frst step of the development process was to conduct a literature review, followed by the second step which was to develop the WRITE. During the development, the authors identifed the necessary hardware and software for the WRITE and outlined a schematic to show the connection of major hardware components. The third step was to develop the LWSM Model for monitoring the on-site construction labor working status by comparing data from the WRITE with the industry benchmark data. A survey methodology was used to acquire industry benchmark data from bridge construction experts. The fourth step was to demonstrate the implementation of the LWSM Model at a bridge construction site. During this phase, labor working status data collected using the WRITE was compared with the benchmark data to form the basis for the project managers and engineers to make effciency improvement decisions. Finally, research fndings and recommendations for future research were outlined. The success of this research made several contributions to the advancement of bridge construction. First, it advances the application of wireless technology in construction management. Second, it provides an advanced technology for project managers and engineers to share labor working status information among project participants. Finally, using the developed technology, project managers and engineers can quickly identify labor effciency problems and take action to address these problems. .

Authors and Affiliations

Seonghoon Kim, Yong Bai

Keywords

Related Articles

PILOT STUDY OF TEACHER BURNOUT IN GEORGIAN CONTEXT

Modern schools have multiple demands to teachers causing prolonged stress often resulting in professional burnout. Research on teacher burnout is conducted at various countries of the world. Taking into account the sig...

FORESTRY EXTERNALITIES IN THE ENVIRONMENTAL MANAGEMENT ACCOUNTING SYSTEM

Environmental management accounting is an environmental voluntary instrument, which is aimed at environmental and economic benefits. It is possible to apply environmental management accounting in different industry sec...

THE EVOLUTION OF RISK MANAGEMENT RESEARCH: CHANGES IN KNOWLEDGE MAPS

One of the leading trends in modern academic research is risk management. Over the years, the approach to risk management has changed and affected many different areas. This study aims to investigate changes in risk manag...

MeaSurINg DIgItal DIVIDe IN KINg abDulazIz uNIVerSIty

Due to the undesirable effects of the gap between citizens to access and use information and communication technologies (ICT), most researchers have been paying much attention to the threat of a digital divide. Unfortuna...

MATRIX-BASED PROJECT PLANNING METHODS

Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, �96�; Fulkerson, �96�; Kelley & Walker, �959; PMI, ���6; Pritsker, �9...

Download PDF file
  • EP ID EP32154
  • DOI -
  • Views 330
  • Downloads 0

How To Cite

Seonghoon Kim, Yong Bai (2013). deVelopINg a model to eNhaNce labor productIVIty uSINg brIdge coNStructIoN beNchmark data. Problems of Management in the 21st Century, 7(7), -. https://europub.co.uk./articles/-A-32154