Development of a model for determining a priority sequence of power transformers out of service
Journal Title: Восточно-Европейский журнал передовых технологий - Year 2018, Vol 3, Issue 8
Abstract
<p>The research is devoted to the development of a model and algorithm for making decisions on determining the priority of power transformers out of service. Reducing the reliability of EPS operation, caused by the objectively existing aging of power transformer equipment, requires consideration of equipment significance when planning the power transformers out of service. For this purpose, it is proposed to use the theory of fuzzy sets and the Pareto method. The result of solving the optimization problem for multicriteria analysis is a vector of the best alternatives, built on the principle of dominance. The developed algorithm of complex simulation of the EPS state and technical condition of the power transformer for making decisions on the determination of priority of power transformers out of service allows for effective decision-making. The results of probabilistic and statistical simulation of EES states using the Monte Carlo method allow us to take into account the probabilistic nature of emergency situations in the EPS when determining its weakest elements that require priority replacement. The advantage of the proposed approach is taking into account the technical condition of electrical equipment for risk assessment of the EPS emergency situation. A comparative analysis of ranking results of power transformers based on the risk assessment of the EPS emergency situation confirmed the high efficiency of planning of EPS states when solving the problems of preventive control. The developed model will be used for further research and development of the algorithm for making effective decisions regarding the operation strategy of the power transformer and preventive control of the subsystem operation of the electric power system. The obtained results of complex simulation of the EPS state and technical condition of the power transformer give grounds to assert the possibility of software implementation of operation risk analysis of the electric power system for power supply companies.</p>
Authors and Affiliations
Eugen Bardyk, Nickolai Bolotnyi
Construction of a generalized probabilistic-physical model of reliability of a two-level active phased antenna array
<p>A generalized probabilistic-physical model of reliability of a two-level active phased antenna array (APAA) of a multifunctional radar station was presented.</p><p>When constructing the APAA physical model, definition...
Construction of a model for the distribution of radial load among the bearing's rolling bodies
<p>We have proposed analytical and computer models related to the distribution of radial load among the rolling bodies in a single-row radial bearing.We have analyzed patternsin the geometry and deformation of parts, as...
Development of a model for the estimation of financial processes in logistic systems at industrial enterprises
<p>The model and the method for assessment of the effectiveness of management of financial processes in logistic systems of industrial enterprises were substantiated. The model takes into consideration the parameters of...
Efficiency of the air heater in a heat recovery system at different thermophysical parameters and operational modes of the boiler
<p class="a">We have examined, for the plate heater included in a heat recovery system of the boiler plant, the influence of its thermophysical parameters on the losses of exergetic power under different operational mode...
The optimization algorithm for the directions of influence of risk factors on the system that manages the potential of machine-building enterprises
<p>The lines of influence of risk factors on the system of management of financial potential of machine-building enterprises were determined. Their application makes it possible to provide enterprises with complete and r...