Development of procedure to control flow distribution in water supply networks in real time
Journal Title: Восточно-Европейский журнал передовых технологий - Year 2018, Vol 6, Issue 8
Abstract
<p class="a">It is required to substantiate the method for determining the number of control nodes both during designing networks taking into consideration its supply, and in the process of its operation when hydraulic characteristics of the sections change. It is necessary in order to substantially reduce energy consumption of pumping equipment and to prevent significant leakage. The processes of formation of zones of insufficient head in water supply systems were explored. The method of flow distribution control in water supply network, which makes it possible to substantiate the necessary and sufficient number of control nodes and the place of their location, was proposed.</p><p class="a">It was shown that the resulting decisions are coordinated with the existing methods for ensuring the necessary head in a network. This opens additional opportunities in flow distribution control, namely, specification of control nodes location in the water supply system during its operation.</p><p class="a">As a result of the studies, the principle of determining the number of control nodes was proposed, which makes it possible, depending on the area of zones with insufficient head, to determine their necessary number when designing a water supply network and specify the location during operation.</p><p class="a">According to the presented procedure of flow distribution control in water supply systems, hydraulic calculations for various modes of water pumping are performed, water consumption in the sections that are in operation at the time of measurement of piezometer in control nodes is determined. The actual node heads are determined, the nodes on the border of the zones with insufficient head, from which, if necessary, additional head control nodes are assigned, are established. At the stage of networks designing, a change in operation parameters of the network is modeled. Piezometric marks in the nodes are determined relative to supply nodes, where the head value is specified. The criterion for selection of the number of control nodes and their location places is the magnitude of minimum head in them and the dimensions of the zones with insufficient head.</p>There were developed the recommendations and supplements to existing practices of flow distribution control, which determine the number and location of control nodes at the stage of design and in the process of the operation of water supply networks. This makes it possible to maintain the necessary head in network nodes, prevent its exceeding, which helps to reduce leakage and power consumption costs at pumping stations
Authors and Affiliations
Oksana Dobrovolska
The method for evaluation of educational environment subjects' performance based on the calculation of volumes of msimplexes
<p class="a">We propose the method for comprehensive performance evaluation of subjects of educational environments, specifically higher educational institutions, based on calculation of generalized volume of the m-simpl...
Influence of modification of the solid component on the properties of non-autoclaved aerated concrete
<p>This paper reports results of research into the modification of a solid component in the non-autoclaved aerated concrete with a lime-carbonate additive that contains calcium carbonate (calcite), calcium hydroxide (por...
Intensification of the process of metallizing tungstencontaining ore raw materials by the powder metallurgy method
<p>X-ray diffraction phase analysis of samples performed on a DRON-6 diffractometer has shown that the processes of CaWO<sub>4</sub> transition to WC and W<sub>2</sub>C had the highest probability in the temperature rang...
Constructing and exploring the model to form the road map of enterprise development
<p>The study addresses the task on determining the optimal road map for the enterprise development – the choice of the sequence of projects and their parameters, which would ensure the achievement of the goal taking into...
Development of energy-saving technology to maintain the functioning of a wind-solar electrical system
<p>An integrated system to support the functioning of a wind-solar electric system has been designed, based on predicting a change in the capacity of a rechargeable battery when measuring voltage at the input to a hybrid...