Estimation of Standard Time in Production of Light Weight Brick Manufacturing Using Ball Mill
Journal Title: International Journal of Advances in Scientific Research and Engineering - Year 2016, Vol 2, Issue 1
Abstract
One of the efforts that must be undertaken by companies in the field of production is the production process should be designed as efficiently and effectively as possible. For that in the implementation of the production process of the need for planning and monitoring good production so lightweight brick production process can run well, so that later can increase the number of qualified products. The aim of research analyzing the quality standard time lightweight brick production process, method of data collection directly to the worker / operator in the process I Ball Mill and Raw Material. The research result analysis cycle time, normal time and standard time, then the part I. Process Ball Mill and Raw Material 1 operator obtained a standard time 67.86 minutes, Operator 2 is obtained standard time standard time acquired 36.20 minutes , Operator 3 is a standard time 56.95 minutes. Standard time or standard time gained to the three operators in the process I. Ball Mill and Raw Materials takes one time settlement activities in the amount of 161.01 minutes.
Experimental Investigation to Study the Thermal Performance of a Silicon Carbide Coated Furnace
This paper describes a new method which increases the radiation heat transfer of furnace refractory. As heating-up time is decreased, the method also makes the operation of the furnace more flexible. Application of silic...
Indian Confrontation To E-commerce
The eCommerce sector has seen unprecedented growth in 2014. The growth was driven by rapid technology adoption led by the increasing use of devices such as smart phones and tablets, and access to the internet through bro...
Design and Analysis of Rudder Hinges of an Aircraft
On an aircraft, the Rudder is one of the important directional control surface along with the rudder-like elevator (attached to the vertical stabilizer) and ailerons (attached to the wings) that control pitch and roll, r...
Adjustment among College Students
For college students, adjustment required in various dimensions, which degree and type is varied with students depending on background, experience and prior schooling and environment of college. It’s a process of finding...
Dynamic Grid Based Authentication With Improved Security
Today IT infrastructure is one of the important parts of everyone’s life. Various applications are used for string managing and transferring data from one place to another. We have various techniques to secure these appl...