Exploration and Practice of Intelligent Operation-maintenance Platform for Hang-Hai Intercity Railway Track Hospital
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 1
Abstract
[Objective] Aimed at the OM (operation-maintenance) pain points and intelligent OM requirements of Hang-Hai (Hangzhou to Haining) Intercity Railway, to explore a path for intelligent OM high-quality development, the investigation and construction of Hang-Hai Intercity Railway track hospital intelligent OM platform is needed, and development suggestions for the future digital, automated, and intelligent OM are proposed. [Method] By analyzing the existing OM pain points and intelligent demands of railway lines, the overall architecture and functional aspects of the Hang-Hai Intercity Railway track hospital intelligent OM platform version 1.0 are introduced. From aspects such as on-route train status monitoring, critical component analysis, optimization of maintenance procedures and schedules, machine-assisted manual work, and intelligent OM management empowerment, the construction and practical effects of the track hospital intelligent OM platform are elucidated. Targeted development recommendations are also provided. [Result & Conclusion] Version 1.0 of the track hospital intelligent OM platform achieves certain results in supporting ground-assisted train main line fault handling, train critical component analysis, optimization of maintenance procedures and schedules, and OM management empowerment. To achieve highly intelligent development of the track hospital intelligent OM platform, targeted development suggestions are put forward, including enhancing the machine learning capabilities of intelligent sensing devices, integrating multiple professional system interfaces and decoupling analyses, establishing expert knowledge bases and specialized capacity mechanisms, and strengthening the integration of human and machine practices.
Authors and Affiliations
Feng HUANG
Sensitivity Analysis of Design Parameters for Suspended Monorail Single-ribbed Arch Bridge
[Objective] As there are few case studies on suspended monorail single-ribbed arch bridge, it is necessary to analyze the sensitivity of different design parameters to better instruct the design and construction of the b...
Influencing Factors of Shield Tunnel Segment Floating in Muddy Siltstone Stratum
Objective When shield tunnels crossing water-rich muddy siltstone stratum, the phenomenon of multi-ring tunnel segment overall floating often occurs, leading to quality defects such as segment damage, misalignment, and a...
Development and Application of Automated Assembly Testing Production Line for EMU Air Springs
[Objective] As the core component of EMU (electric multiple units) bogie system, the performance condition of air springs is directly linked to the operational efficiency and safety level of EMU. Therefore, it is essen...
Design and Implementation of Open Smart Training Center for Urban Rail Transit Vehicles
[Objective] Existing training centers are generally accessible to students only during scheduled class hours. To ensure sufficient hands-on practice time for students to develop their skills, assisting them in building...
Architectural Design Proposal for Beijing Subway Line 19 Ping’anli Interchange Station
Objective Given the large scale of urban rail transit interchange stations, numerous environmental constraints, and the significant difficulties in station architectural design, it is necessary to conduct a scientific an...