Faktor-Faktor yang Mempengaruhi Contract Change Order pada Pekerjaan Rehabilitasi Jalan Mataiwoi-Abuki

Journal Title: Sultra Civil Engineering Journal - Year 2022, Vol 3, Issue 1

Abstract

The research was conducted using descriptive statistical methods, namely by analyzing data and questionnaires to determine the mean and then calculating the value of the Relative Interest Index (IKR). This analytical method will be very useful for identifying the rank of respondents and giving priority to study variables. The results showed that the factors causing CCO were the effect of cost (0.362) with a t count of 0.869. The dominant factors causing Contract Change Order (CCO) that affect cost and time are the contractor factor, then the influence of cost, natural conditions, planning & design, time, and the lowest one is the owner's influence.

Authors and Affiliations

Rajanun Rajanun, Irwan Lakawa, Sitti Hawa, Haryono Haryono, Sufrianto Sufrianto

Keywords

Related Articles

Kajian Infrastruktur Transportasi Darat Dalam Pengembangan Wilayah Kecamatan Tongauna Kabupaten Konawe

The development of rural areas from the agricultural base sector in the field of food through land transportation infrastructure is the main focus of this research. The location of the object of research was Tongauna Dis...

Pengaruh Penambahan Admixture Terhadap Kuat Tekan Beton Dari Berbagai Merek Semen

Tonasa cement, Bosowa cement, and Tiga Roda cement have diffenrence characteristic from procedure to produce and composition of ingredients, the difference are probably reach the diffenrence respond or effected from thre...

Analisis Pengembangan Sistem Distribusi Pada Sumber Mata Air Desa Lamendora Kecamatan Kapoiala Kabupaten Konawe

Water is an important component for the life of living things on earth and cannot be separated from the need for water. Water is the main requirement in the process of life on earth so that there is no life if there is n...

Faktor-Faktor Yang Mempengaruhi Mutu Pelaksanaan Proyek Peningkatan Jalan Tedubara-Pising Kabupaten Bombana

This study aims to analyze the factors that influence the quality of the implementation of improving the Tedubara-Pising street in Bombana Regency. This study uses quantitative data analysis techniques with a sample size...

Rekayasa Bahan Pada Pekerjaan Pengaman Pantai

Material Engineering is used to find alternatives or ideas that aim to produce better / lower costs than the previously planned price with functional limitations and quality of work. The purpose of this research is to an...

Download PDF file
  • EP ID EP710757
  • DOI 10.54297/sciej.v3i1.240
  • Views 60
  • Downloads 0

How To Cite

Rajanun Rajanun, Irwan Lakawa, Sitti Hawa, Haryono Haryono, Sufrianto Sufrianto (2022). Faktor-Faktor yang Mempengaruhi Contract Change Order pada Pekerjaan Rehabilitasi Jalan Mataiwoi-Abuki. Sultra Civil Engineering Journal, 3(1), -. https://europub.co.uk./articles/-A-710757