FINITE ELEMENT ANALYSIS OF THE STRESS AND STRAIN STATE OF THE NODE OF THE TOP BELT OF THE STEEL AND CONCRETE COMPOSITE CABLE SPACE FRAME
Journal Title: Збірник наукових праць Українського державного університету залізничного транспорту - Year 2017, Vol 171, Issue 5
Abstract
The article presents a design and numerical research of a node connection of spatial modules of the steel and concrete composite cable space frame in top chord. As a result of the research, an effective and simple constructive solution of the node connection of the top belt elements of a new type of double-sided construction was created. The effectiveness of the node was established based on the results of the computer simulation the structure behavior under load for various boundary conditions by the finite element method, and based on the finite element analysis of the stress-strain state. The finite element analysis of the stress-strain state of the node connection for elements of the top belt of the steel and concrete composite cable space frame showed that its design does not have weak sections and places of concentration of considerable stresses. Modeling the behavior of the steel and concrete composite cable space frame under the action of the load showed reliable operation of the node connection. Thus, the node connection that was designed provides joint operation the constituent elements of the steel and concrete composite cable space frame, regardless of the way the external load is applied.
Authors and Affiliations
Grygorii Gasii
SWITCH’S WEAR-RESISTANCE INVESTIGATION FOR OPERATING CONDITIONS OF KIEV UNDERGROUND RAILWAY
Maintenance of track and switches of differs significantly from main-line railway. This is caused by other operating conditions of rail track and switches. In underground railway used special project switches, also there...
ANALYSE OF STRENGTH GLUED-IN STEEL RODS INSTALLED IN LVL BY TAKING INTO ACCOUNT STRENGTH BY SHERE
The glued-in steel rods as an effective method for performing rigid joints of timber structures are used in joints of elements from new wood based materials, including veneer based. The LVL elements has high strength cha...
IMPROVING THE ORGANIZATION OF PRIVATE TRANSPORT AT THE AMOUNT OF CHANGING THE SIZE OF PASSENGER SECTIONS
The analysis of the traffic of suburban trains on the stations of Kharkiv and Sumy units was carried out. It was discovered that suburban trains occupy most of the time from all trains in the daily schedule of trains (GR...
IMPROVING THE RELIABILITY OF POWER TRANSFORMERS OLTC DEVICES
It is established that one of the effective ways to improve the reliability of the power transformer as a whole is to increase the reliability of its on-load tap-changer (OLTC). As a result of the analysis of statistical...
DISPATCH CONTROL OF THE MOVEMENT AT THE DIFFERENTIATION OF THE CONSUMPTION OF TRAINS AT THE SITE
The paper shows that the main task in traffic management is security. The main dispatching management tool is the train schedule. From the correct planning of the site depends on the possibility of uninterrupted departur...