Hydroelectric power plant contributes much for modern people who use electric equipment. This study aims to analyze the power flow of the 150kV Aceh Power System under maximum loading conditions before and after the entry of Peusangan hydropower in 2018. The addition of new power plants is one way to fulfill people's need for electric energy so that a power flow study is needed to see the impact of the addition. The problem of this research is limited to determining the value of the substation voltage, active power flow and reactive power on various channels and power losses before and after Peusangan hydropower comes. The method of power flow approach that will be used in this research is Gauss-Seidel method with accuracy factor 0.0001 through simulation with the help of ETAP 12.6.0 software. The simulation is done in two scenarios: 1) Power System of 150kV Aceh at present; and 2) Entrance of Peusangan Power Plant on Power System 150kV Aceh. The simulation result shows that the Banda Aceh substation is a substation near the undervoltage limit on the upcoming Aceh 2018 subsystem with the value of the voltage is 137.14 kV or 91.43%. The highest active power and reactive power after the addition of the power plant are on the Lhokseumawe - Arun channel of 105,897 MW and 51,734 Mvar. The highest power losses after the inclusion of new power plants occurred on the Sigli - Banda Aceh line of 1,309 kW and 4,705 kvar.

Authors and Affiliations

Ramdhan Halid Siregar, Syahrizal Syahrizal, Muhammad Arifai

Keywords

Related Articles

  ASSESSING THE POTENTIAL ROLE OF ANAEROBIC DIGESTION ON BIODEGRADABILITY OF COPPER TREATED BIOMASS

  Bach anaerobic digestion was carried out under mesophilic condition at the temperature of 370C and retention time of 30 days. Two sets of cultures were prepared in 500 ml capacity incubation bottles. The first...

 MEDICINAL UTILIZATION OF HERBS FOR THE TREATMENT OF ERECTILE DYSFUNCTION IN LERE LOCAL GOVERNMENT AREA OF KADUNA STATE, NIGERIA

 This paper examined the indigenous uses of medicinal plants for the treatment of erectile dysfunction in Lere Local Government Area of Kaduna State, Nigeria. One hundred (100) respondents were purposively selecte...

 ASSESSMENT OF LIPID PEROXIDATION MARKERS AND ROINFLAMMATORY CYTOKINES IN ARSENITE-EXPOSED RATS

 Arsenic exposure has been associated with diverse diseased states, including cancer and atherosclerosis. Changes linked with these states include heightened oxidative stress and immunological responses...

 RENEWABLE ENERGY AND RENEWABLE R&D IN EU COUNTRIES: A COINTEGRATION ANALYSIS

 In recent years, increased attention has been directed towards carbon dioxide emissions and environmental impacts, as industrialized countries have had to find ways of reducing energy use in order to meet Kyoto t...

GENERAL GUIDANCE FOR DESIGN AND CONSTRUCTION OF GRAVITY PLATFORMS

Among the different types of offshore platforms which are mainly categorized according to waterdepth of the installation location, the gravity platforms have different type of construction and installation. The platforms...

Download PDF file
  • EP ID EP572920
  • DOI -
  • Views 109
  • Downloads 0

How To Cite

Ramdhan Halid Siregar, Syahrizal Syahrizal, Muhammad Arifai (2017). HYDROELECTRIC POWER PLANT (PLTA) OF PEUSANGAN 1 AND 2 4X22MW AT SUBSISTEM ACEH. ASIAN JOURNAL OF NATURAL & APPLIED SCIENCES, 6(4), 1-9. https://europub.co.uk./articles/-A-572920