Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects
Journal Title: Engineering, Technology & Applied Science Research - Year 2016, Vol 6, Issue 4
Abstract
Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW) method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.
Authors and Affiliations
D. Mirzai Matin
A Model For the Development οf Employees’ Learning (Career Path) in Industrial Enterprises
The goal of this study is to propose a model for the development of employees' learning (career path) in industrial enterprises. In the research a descriptive-survey method along with field research were used. The statis...
RETRACTED: Safety Index Evaluation and Calibration of Load and Resistance Factors for Concrete Beams Under the Simultaneous Effects of Bending, Shear and Torsion
This article has been retracted at the request of the Editor-in-Chief due to extended similarites with a previously published paper (in Persian). The previously published paper is: F. Jafari, J. Akbari, A. Jahanpur...
Assessing Power System Stability Following Load Changes and Considering Uncertainty
An increase in load capacity during the operation of a power system usually causes voltage drop and leads to system instability, so it is necessary to monitor the effect of load changes. This article presents a method of...
BIM and Lean Construction: The Evolution Obstacle in the Brazilian Civil Construction Industry
This article presents the teaching approach of different universities in the state of Rio de Janeiro regarding the dissemination of two civil construction learning paradigms: BIM and Lean Construction. The article’s main...
Effect of Adaptation Gain in Model Reference Adaptive Controlled Second Order System
Adaptive control involves modifying the control law used by the controller to cope with the fact that the parameters of the system being controlled change drastically due to change in environmental conditions or in syste...