Improvement (Kaizen): Very High Fixture Set up Time on VMC Machine

Abstract

Nowadays the automotive industry is facing various problems because of changing global scenario in terms of high quality expectation, reduced cost of production and increased productivity. All the companies are in the motive to solve these problems through the application of modern techniques. This project attempts to provide an effective solution for these problems through lean manufacturing techniques. The key objective of this project is to eliminate the wastes and cost of production and to increase the quality and productivity through shorter lead time and increased value added activities. This project deals with collection of the time taken for each processes and the bottleneck operations have been identified and a current state of value stream map was developed. The suggestions were made by identifying and implementing various improvements in processes, also to develop the future state value stream map for further improvements to achieve the objectives of this project. Makarand Prabhakar Lehekar | Prof. Mangesh Urne | Prof. Mrs. Suvarna Pingle"Improvement (Kaizen): Very High Fixture Set up Time on VMC Machine" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-1 | Issue-6 , October 2017, URL: http://www.ijtsrd.com/papers/ijtsrd4615.pdf http://www.ijtsrd.com/engineering/other/4615/improvement-kaizen-very-high-fixture-set-up-time-on-vmc-machine/makarand-prabhakar-lehekar

Authors and Affiliations

Keywords

Related Articles

Finite Element Analysis of Ball Bearing for Different Materials

Bearing is an important part of a moving machine which is used for relative motion between the contact surfaces. Wear and tear of bearing is a common problem due to friction between the moving parts. A lot of researchers...

Brief Review on Al6351 Composite

For the past few years there has been a rapid growth in the utilisation of aluminium alloys, particularly in streams like aerospace and automobile industries. The versatility of aluminium makes it widely used metal. It i...

Predefined Height Measurement of the Slab in Plate Mill

In the past 20 years, we can see various changes in the rate of production in industries. This has been achieved with the help of advanced technologies which leads to the growth of industries. The challenging problem of...

Pointers, Problems and Prospects of FMCG in Rural Market

The Indian rural market with its vast size and demand base offers a huge opportunity that companies cannot afford to ignore. The Fast Moving Consumer Goods (FMCG) sector is a corner stone of the Indian economy. This segm...

Impact of GST on FMCG Sector and Consumers - A Study

1st July 2017, it is regarded as a major reform in Indian taxation system till now. This category of tax introduced by state and central government of Indian by amalgamating different types indirect taxes under one head...

Download PDF file
  • EP ID EP358317
  • DOI -
  • Views 115
  • Downloads 0

How To Cite

(2017). Improvement (Kaizen): Very High Fixture Set up Time on VMC Machine. International Journal of Trend in Scientific Research and Development, 1(6), -. https://europub.co.uk./articles/-A-358317