Improving the methodology of main power equipment choice for the gas turbine plants
Journal Title: Elektronika - Year 2015, Vol 19, Issue 2
Abstract
Our paper considers the problem of economic substantiation of the choice of the main power equipment at the stage of functional studies of investment projects in conditions of uncertainty and incompleteness of initial data. As a solution to the designated problem we suggest using the method of the best equipment for gas turbine power plant choice. The method is based on an optimality criterion of power equipment choice which allows us to determine the best solution for the gas turbine from the perspective of capital and operating costs minimizing.
Authors and Affiliations
Evgeny Lisin, Wadim Strielkowski, Ivan Komarov
Active Comb Filter Using Voltage Differencing Transconductance Amplifiers
A new active comb filter employing Voltage Differencing Transconductance Amplifiers (VDTAs) is proposed to eliminate the selected frequencies of different signals. The proposed filter is based on VDTAs, capacitors and re...
Editor's Column
N/A
Simulation of a Pick-and-Place Cube Robot by Means of the Simulation Software Kuka Sim Pro
In this work the creation of the program code for industrial robot and the simulation of a robot cell by means of the simulation software KUKA Sim Pro in version 2.2.2, is presented. Simulated and programmed is, in reali...
Design of a 1 DOF MEMS motion stage for a parallel plane geometry rheometer
Rotational rheometers are used to measure paste properties, but the test would take too long to be useful for quality control (QC) on the job site. In this paper, a new type of rheometer is proposed based on a one degree...
An Improved Design of Gallager Mapping for LDPC-coded BICM-ID System
Gallager mapping uses different signal points with different probabilities by assigning several labels for one signal point, and thus provides a promising approach to achieving shaping gains. An important issue in Gallag...