Industrial development of near-open pit reserves based on multivariate analysis and computer modelling of geotechnology objects
Journal Title: Вестник МГТУ - Year 2019, Vol 22, Issue 1
Abstract
The conditions for potential production of deposit reserves are studied at the initial stage of its development as every deposit is a unique one. Mining conditions can change during production, therefore, it is necessary to adapt the mining technology to the conditions of the field. Adaptation is possible based on the identification and assessment of all factors affecting the process of mining. The authors have revealed principal parameters influencing on a choice of mining technology and mining safety when developing near-open pit reserves of the Khibiny apatite-nepheline deposits under complicated mining-geological and technical conditions. The paper demonstrates examples of modelling open and underground geotechnology objects in MINEFRAME mining-geological information system by using a module of automated analysis of mining-geological conditions. The module allows automated formation of vertical cuts within an ore body with the set spacing. For each section, the occurrence elements are determined: angle of incidence, normal thickness, ore areas, including security pillars. This approach reduces significantly the duration of measurements and analysis of mining-geological conditions. The authors have developed the options to mine the near-open pit reserves of the Saamsky open pit, where mining had been completed and there is no access there because of transport communications absence. The industrial stocks and indicators of their extraction options have been identified by options. Integrated engineering and geomechanical estimation of production conditions for deposit reserves by computer modelling allows improving a perception of visual information and developing an optimal mining method to develop deposits.
Authors and Affiliations
O. V. Belogorodtsev, E. E. Khomkin
Calculation determination of compensatory capabilities of pipeline routes of ship systems
The paper considers the problem of improving the manufacturability of ship system pipelines at the stage of designing. Some solutions of manufacturing and installation of ship system pipelines without taking dimensions a...
Numerical modelling of fragmented mined rock flow during ore drawing using the ROCKY DEM programme
he results of analyzing the existing methods and algorithms of predicting losses and dilution of ore at its release through the inlets after the explosive crushing of the rock mass have been presented. It has been shown...
On reasons of specific composition of the Keivy domain rocks (the Kola Peninsula)
The Keivy domaindiffers from the other structures of the Kola region by the specific composition of the metamorphic complexes, the presence of the oldest for the region alkaline granites and gabbroanorthosites associated...
Features of the preservation of vitamins in chocolate
Bitter, milk and white chocolate differ in terms of identification, including the content of the total dry residue of cocoa and the mass fraction of fat. The mass fraction of fat is regulated by state standards and is an...
Ti-Zr placer mineralization in Neoproterozoic (Upper Riphean) rocks of Kildin Formation and in contemporary beach sands of Sredny and Rybachy Peninsulas, Kola Region
Concentration mechanisms of titanium-zirconium placer mineralization in Neoproterozoic terrigenous rocks of Zemlepakhtinskaya Formation, Kildin Group, and in contemporary beach deposits from Sredny Peninsula and Motka Ca...