Influence of Different Opening Positions of Shield Method Connecting Passage on Main Tunnel Segment Internal Force

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 7

Abstract

Objective In the 9 m level large-diameter shield tunneling, there are no engineering cases using shield method for constructing connecting passages yet. Due to the influence of clearance and evacuation platform height, a certain eccentricity exists between the connecting passage and the main tunnel, resulting in the impact of shield launching and receiving with eccentricity for main tunnel structure. It is necessary to investigate the influence of different opening positions of shield method connecting passage on the internal forces of main tunnel segments. Method Based on a city railway project, numerical simulation method is used to analyze the mechanical response of main tunnel segments during the launching and receiving stages of above connecting passage construction under different eccentricity conditions. Result & Conclusion During the construction of shield method connecting passages, the most critical stage is when the thrust acting on the shield reaction frame is zero. As the eccentricity increases, the convergence deformation of special segments in main tunnel and the internal forces in steel and concrete segments gradually decrease, while the circumferential and longitudinal shear forces gradually increase. The internal forces in ordinary concrete segments adjacent to the special segments on the opening side also increase significantly, which requires special attention in structure design.

Authors and Affiliations

Meng ZHOU

Keywords

Related Articles

Vehicle Formation Scheme for Wuxi Metro Line 5

Objective To somewhat address the issues of low passenger load factor, high operating cost, and excessive reliance on government subsidies in medium-sized urban rail transit network, taking Wuxi Metro Line 5 as example,...

Research on Track-covering Vacuum Cleaner with Adjustable Parameters for Urban Rail Transit

[Objective] In view of the difficulty to remove the iron dust generated by rail grinding in urban rail transit, it is necessary to design a set of track-covering vacuum cleaners with adjustable parameters (abbreviated as...

Selection and Heat Dissipation Analysis of Regenerative Braking Energy Absorption Device in Urban Rail Transit Depot

[Objective] The regenerative braking energy absorption resistance in urban rail transit depot has a large heat dissipation. In order to effectively solve the problem, it is necessary to select the right type of regenerat...

Optimization of Train Anti-slip Control Strategies for Urban Rail Transit Multi-system Coordination

Objective Under extreme line and weather conditions, urban rail transit trains often experience low adhesion leading to wheel-rail slip or slide phenomena in mainline operation, making it necessary to optimize the train...

Impact of Metro Station Platform Staircase and Escalator Setting Parameters on Pedestrian Evacuation Time

[Objective] Factors such as width, vertical height, and operational speed of staircases and escalators on metro station platform impact passenger evacuation time significantly, therefore it is necessary to study the impa...

Download PDF file
  • EP ID EP742598
  • DOI 10.16037/j.1007-869x.2024.07.014
  • Views 34
  • Downloads 0

How To Cite

Meng ZHOU (2024). Influence of Different Opening Positions of Shield Method Connecting Passage on Main Tunnel Segment Internal Force. Urban Mass Transit, 27(7), -. https://europub.co.uk./articles/-A-742598