INFORMATION MANAGEMENT IN INTEGRATED PROJECT DELIVERY

Journal Title: Scientific Journal of the Military University of Land Forces - Year 2012, Vol 166, Issue 4

Abstract

The article discusses the problems of today's construction project management. Despite the implementation of modern technologies and building materials, and the use of software to support engineering analysis and decision-making in construction, efficiency gradually decreases. The article describes a new concept of integrated construction project management (Integrated Project Delivery) and compares it with the previously used management methods, such as Design-Bid-Build and Design & Build. The article also shows the problems associated with the flow of information during the completion of a construction project and the benefits of integrated construction project management in conjunction with the BIM (Building Information Modelling) technology. The article also describes the world's most popular format for data exchange between different software: IFC (Industry Foundation Classes), which allows exchanging information on many aspects of a construction project.

Authors and Affiliations

Krzysztof ZIMA

Keywords

Related Articles

POWŁOKI ANTYWODOROWE NA METALACH

Przedstawiono propozycję użycia powłok z tworzyw sztucznych w celu zminimalizowania wnikania wodoru do metali. Na podstawie analizy literatury oraz dotychczasowych badań własnych omówiono proces nawodorowania metali. W o...

Information security – its essence and threats

Due to the exchange of information, organizations are encouraged to create an effective system of information flow that should be monitored on a regular basis in order to minimize the risk of emergence of threats. Due to...

Circumstances of the rise of the so-called Islamic State according to Patrick Cockburn’s perspective

The aim of this article is to analyze the rise of the so-called Islamic State in the perspective of a Middle Eastern and commentator for “The Independent”, Patrick Cockburn, who also publishes in the “London Review of Bo...

SUBLIMINAL MESSAGE IN ADVERTISING AS MANIPULATION AND THREAT TO CONSUMER’S SENSE OF SECURITY

The article presents the issues related to the use of the subliminal message in the media, in particular in advertising. It shows how the subliminal message affects the consumer and why one should treat it as a form of m...

SOCIAL NETWORK ANALYSIS IN RESEARCH ON MILITARY AND NON-MILITARY NATIONAL SECURITY

The aim of this article is to present one of the most advanced research tools, namely social network analysis (SNA), and the possibility of its use when studying military and non-military national security. Our existence...

Download PDF file
  • EP ID EP61554
  • DOI -
  • Views 70
  • Downloads 0

How To Cite

Krzysztof ZIMA (2012). INFORMATION MANAGEMENT IN INTEGRATED PROJECT DELIVERY. Scientific Journal of the Military University of Land Forces, 166(4), 146-158. https://europub.co.uk./articles/-A-61554