Mobile lighting of passenger and material monorails stations
Journal Title: Mining – Informatics, Automation and Electrical Engineering - Year 2018, Vol 534, Issue 2
Abstract
In this article, the authors present the Becker-Warkop company innovative technology development of mobile lighting for passenger and material stations as well as routes during the passage of a suspended monorail. As part of the paper, a technical solution was presented along with its configuration options. The paper also includes standard requirements along with a description of the experiences and good practices obtained during the implementation of this technology.
Authors and Affiliations
Leszek Żyrek, Wojciech Zasadni, Jan Lubryka, Dawid Jendroska
Analysis of switching on selected electrical high voltage circuits
Physical phenomena occurring in high-current contact systems of electric switches, when switching on unloaded transformers and capacitor banks, are much more dangerous than the phenomena occurring in the contact switch s...
Computer-aided design of cutting heads
The design of cutting heads is a complex process in which it is necessary to perform multiple recalculations of complicated formulas and to correct the assumptions of input data. The purpose is to provide high efficiency...
Performance augmentation of continuous miner based system in India: a reliability based approach
A Continuous Miner (CM) is a globally competitive machine, capable of boosting the production of underground mines, which is imperative for future production growth. However, the geological factors and other mining param...
Selected terms used in ”mining telecommunications”
At the beginning of the paper the author pointed out that in many publications which describe technical solutions applied in telecommunications systems and devices for underground mines there are terms which belong to th...
Back-up short circuit protection in underground medium voltage networks
The paper presents issues related to the implementation of back-up short-circuit protection in the final sections of an underground medium voltage distribution network. The difficulties may arise from regulatory requirem...