Modeling and Solving Flow Shop Scheduling Problem Considering Worker Resource
Journal Title: International Journal of Innovation in Engineering (IJIE) - Year 2021, Vol 1, Issue 4
Abstract
In this paper, an uninterrupted hybrid flow scheduling problem is modeled under uncertainty conditions. Due to the uncertainty of processing time in workshops, fuzzy programming method has been used to control the parameters of processing time and preparation time. In the proposed model, there are several jobs that must be processed by machines and workers, respectively. The main purpose of the proposed model is to determine the correct sequence of operations and assign operations to each machine and each worker at each stage, so that the total completion time (Cmax) is minimized. Also this paper, fuzzy programming method is used for control unspecified parameter has been used from GAMS software to solve sample problems. The results of problem solving in small and medium dimensions show that with increasing uncertainty, the amount of processing time and consequently the completion time increases. Increases from the whole work. On the other hand, with the increase in the number of machines and workers in each stage due to the high efficiency of the machines, the completion time of all works has decreased. Innovations in this paper include uninterrupted hybrid flow storage scheduling with respect to fuzzy processing time and preparation time in addition to payment time. The allocation of workers and machines to jobs is another innovation of this article.
Authors and Affiliations
Paria Samadi Parviznejad,Ezzatollah Asgharizadeh,
A Survey of Studentsâ Attitudes to Big Data Analysis in Iranian Universities
Today, with the emergence of new technologies and massive data, big data analysis has attracted the attention of researchers, industries and universities on a global scale. The present research aims to explore studentsâ...
Optimizing The Transportation of Petroleum Products in A Possible Multi-Level Supply Chain
The goal of many supply chain optimization problems is to minimize the costs of the entire supply chain network. However, since environmental protection is one of the main concerns, the green supply chain network has bee...
A Survey of Students’ Attitudes to Big Data Analysis in Iranian Universities
Today, with the emergence of new technologies and massive data, big data analysis has attracted the attention of researchers, industries and universities on a global scale. The present research aims to explore students’...
Modeling and Solving Flow Shop Scheduling Problem Considering Worker Resource
In this paper, an uninterrupted hybrid flow scheduling problem is modeled under uncertainty conditions. Due to the uncertainty of processing time in workshops, fuzzy programming method has been used to control the parame...
Investigation of the Effects of Nano Silica Particles and Zeolite on the Mechanical Strengths of Metakaolin-Based Geopolymer Concrete
Due to its unique qualities, concrete is the most extensively utilized substance in the construction sector after water. However, because one ton of Portland cement produces about one ton of CO2, the Portland cement manu...