Modeling Research Project Risks with Fuzzy Maps
Journal Title: Journal of Applied Quantitative Methods - Year 2009, Vol 4, Issue 1
Abstract
The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research project: the probability of not obtaining quality results was computed considering the over-budget sum and the quality level of research idea. The computed risk is situated on the highest level in risks map. A software system for evaluating risks in e-testing research project was also developed. The research was funded by the Ministry of Education and Research, National University Research Council, Grant PCE_ID_873.
Authors and Affiliations
Constanta BODEA, DASCALU DASCALU
Aspects on Statistical Approach of Population Homogeneity
In this article we emphasize the manner in which this statistical indicator – the variation coefficient (v) - could help the inference on measurable characteristics generated by technological processes. Our interest lies...
Time-cost Optimization Model for Deterministic Network Projects
A deterministic PERT activity-on-arc network G(N, A) with logical operation "AND" at the event's receiver and "MUST FOLLOW" at the event's emitter, is considered. Each activity (i, j)∈ A entering the model can be operate...
Modelling the Educational Process in Asymmetric Information
The level of education is highly related to the future possibilities to find a job. It is obvious that the people with university degrees have better chances that the other ones. A person with higher education degree has...
The Coin Changing Problem as a Mathematical Model
The coin changing problem is a well-known problem to the general public and to operations research specialists and computer scientists. It is a popular topic for both discussion and programming assignments (Ghosh, 2008)....
Security Metrics for Enterprise Information Systems
Managing the security of enterprise information systems has become a critical issue in the era of Internet economy. As any other process, security can not be managed, if it can not be measured. The need for metrics is im...