Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation Constraints

Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 1

Abstract

[Objective] To improve the impact of shunting operations on the track utilization for the depot-returning urban rail transit trains and enhance the train maintenance efficiency, it is necessary to optimize the track utilization of the depot-returning train with shunting operation constraints. [Method] Regarded as a depot-returning train, the transition train is incorporated into the early and late depot-returning plans respectively according to the shunting time. With the minimum number of shunting operations and the shortest running distance for maintenance as the objective function, and taking the constraints of shunting operations into account, a multi-objective optimization model for train track utilization is developed based on an improved grey wolf algorithm, featuring first for individual independent depot-returning plan (early and late depot-returning) and then for all depot-returning plans as a whole. In a case study of the track utilization plan for the depot-returning train on a metro line in Tianjin, the effectiveness and feasibility of the established optimization model are verified. [Result & Conclusion] The train running distance of the track utilization plan obtained from the proposed model is reduced by 65.7% compared with the manual plan (with a 25% reduction in the early depot-returning stage and a 77.7% reduction in the late depot-returning stage), and the number of train shunting operations is zero. The model can achieve the optimal arrangement of track utilization for the depot-returning train on the basis of satisfying the constraints of shunting operations such as train washing, maintenance, and departure on the next day.

Authors and Affiliations

Zengchao ZHANG, Peng XU, Liping XIN, Rui FAN, Chen LI, Zelin WU

Keywords

Related Articles

Characteristics of Lateral Aerodynamic Force Variation of 160 km/h Train Passing through Tunnels

Objective At a speed of 160 km/h, a certain EMU in China exhibits good stability when running on open tracks. However, when passing through single-track tunnels, the tail car experiences periodic lateral swaying issues....

TBM Selection Optimization and Tunneling Parameter Control in Complex Offshore Strata for Urban Rail Transit

[Objective] In order to improve the formation adaptability of the tunnel boring machine (shorten as TBM) and solve the problem of TBM selection for the west extension section of Qingdao Metro Line 2 (hereinafter referred...

Stress Analysis of Waterproof Single-layer Lining Composite Structure in Metro Tunnels Based on Intermediate Layer Theory

Objective The application of sprayed waterproof membranes can enable composite action between the shotcrete and the waterproof membrane in metro tunnel linings. However, there is currently no design guidance or reference...

Impact Simulation Analysis of Wind Resistance Brakes on High-speed Train Aerodynamic Performance under Crosswind Conditions

Objective As the train operational speed increases, various braking methods become essential for ensuring high-speed train emergency safety braking. Wind resistance brakes, which complement wheel-rail adhesion brakes, ha...

Stability Study of Shield Tunnel Excavation Face Induced by Shield Chamber Pressure Entering in Shallow-Buried Sand Stratum

[Objective] Solve the problem of excavation surface stability during shield tunneling with pressure entry in shallow-buried sandy stratum.To solve the problem of the stability of tunnel face of shield tunnel with press...

Download PDF file
  • EP ID EP755015
  • DOI 10.16037/j.1007-869x.2025.01.038
  • Views 1
  • Downloads 0

How To Cite

Zengchao ZHANG, Peng XU, Liping XIN, Rui FAN, Chen LI, Zelin WU (2025). Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation Constraints. Urban Mass Transit, 28(1), -. https://europub.co.uk./articles/-A-755015