A GENTLE INTRODUCTION TO EARNED VALUE ANALYSIS
Journal Title: International Journal of Engineering Sciences & Research Technology - Year 0, Vol 4, Issue 11
Abstract
Every country whether in the developing stage or already developed stage has the need for infrastructure development to further the economic, social, technical growth of the country. All infrastructure projects require 4 important ‘M’ those are Men, Machine, Money and Material. And to complete the project in the estimated amount we have to implement project control & monitoring system to track the progress of the project. Here we are using variance analysis for cost, schedule and time control to check the progress of the project with respect to baseline of the project. Earned Value Analysis (EVA) is a project performance evaluation technique which has been adapted for application in project management. The technique helps in comparison of budgeted cost of work to actual cost.
Authors and Affiliations
Ashutosh Rathi*
ELECTRICAL CHARACTERISTICS OF THE BLENDS OF SILICON AND EPDM OUTDOOR INSULATORS
Polymeric insulators are widely used as outdoor H.V insulators due to their superior service properties in the presence of heavy polluted and wet condition, resistance to vandalism and high dielectric strength vol...
EFFICIENT CONTENT BASED VIDEO RETRIEVAL USING ASR AND OCR TECHNIQUES
E-lecturing has become more and more popular, in the last decade. On the World Wide Web (WWW) is growing rapidly, the amount of lecture video data. For video retrieval in WWW or within large lecture video archives is u...
Current Source Control Phase Shifting For Minimization of Harmonic Current in Distribution System
Power electronic loads inject harmonic currents into the utility system. This paper presents a comparative evaluation of harmonic reduction techniques which satisfy the current harmonic limits specified by the IEE...
THE NEW THEORY OF THE ONENESS OF SQUARE AND CIRCLE
Originally, Pi constant was understood as the ratio of circumference of a circle to its diameter. As the length of the circumference could not be measured due to its curvature, Exhaustion method was adopted for ma...
ACCELEROMETER BASED GESTURE CONTROLLED ROBOT USING ARDUINO
Generally, robots are programmed to perform specific tasks which humans cannot. To increase the use of robots where conditions are not certain such as fire fighting or rescue operations, robots can be made which f...