On Two Stage Open Shop Scheduling in Which Processing Time, Set Up Time Associated with Probabilities Including Job Block Criteria

Abstract

The present paper is an attempt through heuristic method to obtain the optimal sequence for n jobs two stage open shop problem in which Set up time separated from processing times, each associated with respective probabilities Including job block criteria.. The algorithm developed in this paper is very simple and easy to understand. A numerical illustration to clarify the algorithm is also given.

Authors and Affiliations

Deepak Gupta

Keywords

Related Articles

APPLICATION OF DATA MINING METHODS IN ESTABLISHING SIZING SYSTEM FOR CLOTHING INDUSTRY

The purpose of this paper is to present the possible uses of data mining methods in establishing standard sizing system based on anthropometric body measurements variables. Sudanese army officers database was selected fo...

 Secure and Efficient Data Transmission for Cluster-based Wireless Technology Networks

 Secure data transmission network is a decisive issue for wireless technology networks (WTNs). Clustering is an effective and practical way to enhance the system performance & methods of WTNs. In this respectiv...

 3D Printing Making the Digital Real

 3D printing is quickly expanding field, with the popularity and uses for 3D printers growing every day. 3D printing can be used to prototype, create replacement parts, and is even versatile enough to print prosthe...

 Free Vibration Analysis of Orthotropic Thin Rectangular SSSS Plate Using Polynomial Series Function

 Free vibration analysis of material orthotropic rectangular thin plate simply supported on all edges (SSSS) plate using Taylor’s series function in Ritz method was carried out. A Taylor’s series truncated at the 5...

DESIGN AND ANALYSIS OF SWASTIK SLOT LOADED MICROSTRIP ANTENNA AT FR4 LOSSY SUBSTRATE ON L - BAND

This paper presents a novel design of a Swastik shape microstrip antenna with compact nature and the study of various antenna parameters. The antenna is fed by coaxial probe feeding technique. The proposed...

Download PDF file
  • EP ID EP106434
  • DOI -
  • Views 59
  • Downloads 0

How To Cite

Deepak Gupta (30). On Two Stage Open Shop Scheduling in Which Processing Time, Set Up Time Associated with Probabilities Including Job Block Criteria. International Journal of Engineering Sciences & Research Technology, 2(9), 2065-2069. https://europub.co.uk./articles/-A-106434