OPERATIONAL AND MAINTENANCE FEATURES OF THE SV. TRI KRALJA TUNNEL

Journal Title: UNKNOWN - Year 2013, Vol 27, Issue 1

Abstract

The paper focuses on the features of the operation and maintenance of tunnels on the Zagreb-Macelj motorway. When it comes to the operation and maintenance of a series of six tunnels on the Zagreb-Macelj motorway, Sv. Tri Kralja Tunnel is the most challenging structure on the motorway, where it is necessary to provide an adequate level of safety and operability. Tunnel operation is ensured by the concession model of public - private partnership, which is applied to the Zagreb – Macelj motorway. Features of the tunnel infrastructure maintenance are emphasized, as well as importance of the extraordinary maintenance of the tunnel infrastructure. The goal of the tunnel operation and maintenance is to ensure undisturbed and safe traffic flow through the tunnels, by keeping the tunnel in normal functional conditions.

Authors and Affiliations

Zvonimir Deković Boris Cviljak Igor Pili

Keywords

Related Articles

Živa u tlu i zraku kao element-indikator za boksitna ležišta u Istri - eksperimentalni istraživački model

U radu je obrađeno istraživanje sekundarne disperzije žive i nekih drugih elemenata oko boksitnih rudnih tijela u Istri. U tu svrhu izvršeno je uzorkovanje terra rosse uzduž traversi položenih preko boksitnih rudnih tije...

NEKADAŠNJI RUDNIK ASFALTA "ŠKRIP" NA OTOKU BRAČU

Nema pouzdanih podataka kad se započelo s radom u rudniku pakline (asfalta) u Škripu. Pretposlavljamo da je to moglo biti sredinom XVIII stoljeća. Kasnije, oko 1780. poduzetnici dobivaju dozvolu za kopanje pakline i na o...

COMPARATIVE REVIEW OF CROATIAN AND INDIAN AIR POLLUTION STUDIES WITH EMPHASIS ON POLLUTANTS DERIVED BY COAL COMBUSTION

Human health, the environment, and climate are being profoundly aff ected by complex pollutant interactions in the atmosphere. Almost all human activities cause the emissions of air pollutants. Their understanding and qu...

DETONOGRAPHY: MAKING OF MEDIEVAL MINE PRINT

Using the force of explosive authors had made a print of the picture of Renaissance mine onto an aluminium plate. This technique is called Detonography. It has been introduced and developed by Evelin Rosenberg with a num...

HIDROGEOLOŠKA I HIDROKEMIJSKA OBILJEŽJA MASIVA KALNIKA

Kalničko gorje izgrađuju stijene raspona starosti kreda-holocen, koje je prema hidrogeološkim značajkama moguće razvrstati u tri osnovne hidrogeološke cjeline: (1) područje sjeverno od središnjeg masiva Kalnika, izgrađe...

Download PDF file
  • EP ID EP30060
  • DOI -
  • Views 177
  • Downloads 1

How To Cite

Zvonimir Deković Boris Cviljak Igor Pili (2013). OPERATIONAL AND MAINTENANCE FEATURES OF THE SV. TRI KRALJA TUNNEL. UNKNOWN, 27(1), -. https://europub.co.uk./articles/-A-30060