OPTIMISATION OF ELECTRICITY PRODUCTION AND HEATING COSTS BASED ON SHORT-TERM FORECASTS
Journal Title: Scientific Journal of the Military University of Land Forces - Year 2012, Vol 166, Issue 4
Abstract
In this article the author proposes considering the problem of optimising electricity production in a heat and power plant in the heating season combined with the optimisation of its acquisition costs. The proposed procedure in the management of short-term heat and power production on the basis of weather conditions forecasts obtained online from the portal of the Institute of Meteorology and Water Management. The conceptual solution proposes using econometric methods that can be used, namely a combination of regression function, the trend of delayed time-dimensions, multiple regression and linear programming. The article aims at reducing decision-making errors in technological flow management.
Authors and Affiliations
Artur WOŁKOWICZ
SELECTED ASPECTS OF MINE-RESISTANT DESIGN OF OFF-ROAD ARMOURED VEHICLE
The paper presents selected aspects of the design of off-road armoured vehicles for mine-resistance. Special attention was paid to the influence of mine-resistance features on the vehicle’s ability to move off-road. The...
CITIZENSHIP EDUCATION AT THE TIME OF PROFESSIONALIZATION OF THE POLISH ARMED FORCES AS ASPECT OF EDUCATION FOR SECURITY
Security is essential for every society and stands for the basic need of a human being and social development. At the time of globalisation and computerisation, security is closely related to knowledge. A contemporary pe...
COMBAT RELATED POST-TRAUMATIC STRESS DISORDER –CAUSES, SYMPTOMS AND CONSEQUENCES
Post-traumatic stress disorder (PTSD) is observed as a group of post-traumatic mental and physical clinical symptoms. It affects soldiers returning from missions as well as victims of different types of disasters. The co...
CONSTRUCTION PROCESS ACCORDING TO LATVIAN BUILDING REGULATIONS
Building regulations are still different in many European countries even the European Union directives did unify many acts for construction works and construction products in the member countries. The scheme of the const...