Organization of engineering works in deploying a bridge crossing point made of class 20 pontoon material

Journal Title: Vojnotehnički glasnik - Year 2017, Vol 65, Issue 4

Abstract

When using pontoon material for deploying a bridge crossing point and/or some other type of crossing of water obstacles (ferry, landing), it is very important to organize works during the preparation, construction and disengagement of pontoon units and materials for the deployment and maintenance of already deployed crossing points. In the Serbian Armed Forces (SAF) there are specialized units for such works within military engineering, pontoon battalions, and within the River Flotilla (brigade units). The organization of engineering works given in the article represents a method for finding solutions to the use of movable assets and personnel in establishing bridge crossing points (BCPs) made of pontoon materials with a capacity of 20 t. The lack of contemporary literature in drafting the basic documents for the establishment of BCPs (existing literature dates from the 70s and 80s of the last century) is only one of the problems encountered when working in this area so, in the preparation of project documentation, experience from practice is heavily relied upon.

Authors and Affiliations

Nenad Kovačević

Keywords

Related Articles

Table of obstacle course scoring results for Military Academy female cadets

This paper presents the creation of a table for obstacle course scoring results, for female cadets. The table is created based on the results obtained by female cadets during four years of studying at the Military Academ...

Call for papers for issue 3-2017

The instructions to authors about the article preparation for publication in the Military Technical Courier are based on the Act on scientific journal editing of the Ministry of Science and Technological Development of t...

Decision-making process during the fulfilment of military assignments

The paper deals with the decision-making process in crisis management with focus on the Army of the Czech Republic (soldiers at the University of Defence in Brno). Within the research, 44 soldiers were monitored whilst m...

Single shot hit probability estimation as a result of the numerical solution of double integrals using Mathcad

A geometric interpretation of single shot hit probability (Phit) is a volume of 3D space enclosed above by the surface f(y,z) described the bivariate normal distribution and bounded from below by the YOZ plane with the t...

65 years of the Military Technical Courier: Acknowledgments

This editorial marks the jubilee which the scientific journal Military Technical Courier celebrates in 2017 - 65 years of regular and continuous publication. On this occasion, the Editorial Office expresses gratitude to...

Download PDF file
  • EP ID EP298152
  • DOI 10.5937/vojtehg65-8634
  • Views 107
  • Downloads 0

How To Cite

Nenad Kovačević (2017). Organization of engineering works in deploying a bridge crossing point made of class 20 pontoon material. Vojnotehnički glasnik, 65(4), 1060-1079. https://europub.co.uk./articles/-A-298152