Performance Evaluation of Variable Sampling Intervals Control Charts by Simulation

Abstract

The main goal of the wide use of quality control charts is to watch the production process and find any change in the quality of its outputs that can be obtained over time. One of the main defects of Shewhart charts is its relatively slow reaction to the small shifts that occur for the mean of production process[1].Recently, new modifications for the control chart idea have been developed to improve the chart ability; these modifications are based on changing the sampling interval. The basic consideration of variable sampling intervals (VSI) control charts is that after the sample is drawn, the time period for withdrawal of another sample should be short if there is evidence of a change in the production process, and long if there is no evidence of any change. In this research, VSI control chart has been considered for evaluation based on the comparison with the traditional one. Different models have been proposed to study; the pattern of process shift is the main difference between the models of the study, and the simulation used here as an effective tool to evaluate the performance of the VSI control charts. The results of the simulation study are presented and analyzed, If the process shifts are assumed to be a linear time series function, and the time of shift occurrence is zero, then the VSI features will become more effective for the quick detection of process shifts than the traditional fixed sampling intervals (FSI) at low and moderate levels also the conclusions have been drawn and the recommendations for the future work are presented

Authors and Affiliations

Tariq Mohammed Ali Ali

Keywords

Related Articles

ENERGY EFFICIENT AND COST SAVING PRACTICES IN DAIRY INDUSTRIES: A REVIEW

The dairy industry handles a large amount of perishable liquid milk, which has to be processed or converted into value added products. This process consumes a great amount of fuel and electricity per year accounting to a...

Reduced Number of Power Switches in Multi level Inverter Using SPWM Technique to Mitigate For SAG and SWELL

The study objective is to design and implement new topology symmetric for 3phase by focusing on reduced number of semiconductor devices in nine level Hybrid cascaded H-bridge multilevel inverter based on DVR. The main ai...

TEMPORAL VARIATION OF GROUND WATER QUALITY IN CENTRAL GODAVARI DELTA AND ITS SIGNIFICANCE IN HYDRODYNAMICS OF THE AREA

Central Godavari Delta is a Crop Intensive rice bowl of Andhra Pradesh. The present study area covers 16 mandals of East Godavari District of Andhra Pradesh. To study the temporal variation of Chemical Quality in terms o...

COST ESTIMATION AND BUDGET PLANNING ACCURACY LEVEL OF REHABILITATION AND IRRIGATION NETWORK IMPROVEMENT PROJECT USING COST SIGNIFICANT MODEL

Rehabilitation and Irrigation network improvement project activities is one of the budget codes containing inBudget Implementation List (DIPA) of Irrigation Institution in South East Districtusing unit price contract. Bu...

UV RADIATION BY THE DEBYE SPHERE INTERACTION PLASMA - METAL NANOPARTICLES ON THE SURFACE OF PLANT TISSUE

Using The Quantum Model Of Electrodynamics Near Field, In The Present Work It Is To Prove The Existence Of Radiation In The Uv Band, Caused By The Interaction Of Electromagnetic Field Distribution Not Neutral High Freque...

Download PDF file
  • EP ID EP603195
  • DOI 10.24247/ijaerdjun20191
  • Views 89
  • Downloads 0

How To Cite

Tariq Mohammed Ali Ali (2019). Performance Evaluation of Variable Sampling Intervals Control Charts by Simulation. International Journal of Applied Engineering Research and Development (IJAERD), 9(1), 1-12. https://europub.co.uk./articles/-A-603195