Prediction and Analysis of Earth Pressure Balance Shield Machine Advancing Speed in Limestone Stratum
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8
Abstract
Objective The advancing speed of shield machine is crucial not only for the tunnel excavation pace but also for the predicting construction schedule and cost. Therefore, it is necessary to predict and analyze the advancing speed of the shield machine. Method Taking the full-section limestone stratum of Longao Station-Olympic Sports Center West Station interval on Jinan Metro Line 3 as research object, data from shield machine excavation are collected and preprocessed using methods such as zero-push value, outlier removal, and data denoising. To improve prediction accuracy, the dataset is divided into training and validation sets. A model for predicting thrust speed is established from linear regression based on cutterhead torque and total thrust, and the influence law of excavation load on advancing speed is analyzed. Result & Conclusion In limestone stratum, the linear regression prediction accuracy of three advancing speed prediction models all exceeds 0.70, indicating that advancing speed can be accurately predicted based on cutterhead torque and total thrust. During excavation with the earth pressure balance shield machine, fluctuations in cutterhead rotation speed and advancing speed are minimal. As the cutterhead rotation speed increases, the cutterhead torque gradually decreases. Cutterhead torque positively influences the advancing speed; the greater the cutterhead torque, the higher the advancing speed. Under the same stratum and excavation conditions, due to the soil extrusion action of cutterhead, merely increasing the total thrust is not conducive to improving advancing speed, calling for the necessity of simultaneously increasing cutterhead rotation speed.
Authors and Affiliations
Hao LIU, Jianbo CUI, Xia YANG, Qingyang WANG
Experimental Study of Rail Beam Joint Bolt Loosening Impact on Rail Structure Vibration in High-Speed Maglev Maintenance Base
Objective During the train debugging process, significant vibrations may occur in the steel rail beams of high-speed maglev maintenance bases due to their unique structural characteristics, potentially leading to bolt lo...
New Method for Metro Tunnel Catenary Height Detection Based on Mobile 3D Laser Scanning Technology
[Objective] The height of metro tunnel catenary is a crucial parameter for ensuring normal train electrification and requires regular inspection. In response to the significant errors and low precision associated with ot...
Optimization of Urban Rail Transit Train Stock Utilization under Re-coupling Operation Mode
[Objective] Re-coupling operation mode can effectively improve the matching degree between the passenger flow and the transport capacity of urban rail transit, while it also poses challenges to the formulation of the t...
Key Technologies of Vehicle Base Station Design for Suspended Monorail Transit
[Objective] The overall plane layout of the suspended monorail transit vehicle base directly affects train′s operation and engineering cost. The turnout type selection has a great influence on the overall layout of the d...
Technological Innovation of China′s Rail Transit Equipment and Its Value Evaluation from the Perspective of Patents
[Objective] As an important yardstick for measuring technological innovation capabilities, patent is of great significance to the innovative development of rail transit equipment. Currently, the systematic evaluation o...