Production Lead Time Reduction in a Hydraulic Machine Manufacturing Industry by Applying Lean Techniques

Journal Title: American journal of Engineering Research - Year 2017, Vol 6, Issue 1

Abstract

Production lead time reduction is an important means to improve productivity in manufacturing industries. This paper focuses on improving the productivity through lead time reduction in a hydraulic excavator manufacturing facility. Time study has been carried out to estimate the time taken by each and every process in the product fabrication line. Pareto charts are used to analyze the process and bottleneck operations are identified. Process improvement activities are carried out by developing new methods through process and design modifications. Implementation of the proposed process improvements in the fabrication line leads to improved productivity and reduced lead time.

Authors and Affiliations

Saravana kumar . M1 ,, Allen Jeffrey. J2 ,, Mohan Raj. S3

Keywords

Related Articles

Recycling Of Waste Brass And Cast Iron Chips Through Metal Matrix Composite Material Production- Investigation Of Mechanical Properties

In this study, an alternative method to classical fusion process, which resembles the powder metallurgy process, was used in recycling of waste metal chips produced abundantly as a result of machining process. Firstly, u...

Assessment of microbial quality of drinking water in Rabak Town – White Nile State – Sudan 2010

The primary concern with health problems caused by water supply is infectious diarrheal diseases transmitted by the fecal- oral route, there for the principal concern in water quality is the microbiological quality of th...

Evaluation of Temperature Profile on Pool Boiling Using Jet Impingement Cooling System

Controlled accelerated cooling of pipe planar jets is commonly used in run-out-table cooling in hot rolling mills. The methodology undertaken for this research involved design and construction of experiments using a pilo...

Some Of The Techniques For Images Processing Using Matlab

In this paper, we presented a range of useful MATLAB applications for image processing and color detection, each of which is a useful graphical interface useful for those who are not familiar with the MATLAB software beh...

Myorelaxant And Calcium Channel Blocker Properties Of An Aqueous Extract Of Solanum Torvum (Solanaceae) On Isolated Rabbit’s Intestinal Smooth Muscle

The aqueous extract of Solanum torvum (EASt), at concentrations ranging from 10-1 to 6.10-1 mg/ml, caused a dose-dependent decrease in the amplitude of spontaneous rhythmic contractions and basal tone of isolated rabbit’...

Download PDF file
  • EP ID EP399991
  • DOI -
  • Views 68
  • Downloads 0

How To Cite

Saravana kumar . M1, , Allen Jeffrey. J2, , Mohan Raj. S3 (2017). Production Lead Time Reduction in a Hydraulic Machine Manufacturing Industry by Applying Lean Techniques. American journal of Engineering Research, 6(1), 365-773. https://europub.co.uk./articles/-A-399991