PRODUCTIVITY OF CONSTRUCTION PROJECT FROM CONTRACTOR POINT OF VIEW
Journal Title: INTERNATIONAL JOURNAL OF ENGINEERING TECHNOLOGIES AND MANAGEMENT RESEARCH - Year 2018, Vol 5, Issue 12
Abstract
Construction project is a continuous activity that link to one another. If there is a delay in one activity it can make delay to the other activity. One of the factors that affect the project completion time is the productivity of each activity. Research of Contractor point of view on the productivity of construction project is expected to give more actual description of Contractor point of view on work productivity and identifying factors that strongly affect productivity so that it can be used as guidance to take steps to improve productivity in construction project. The method that this research use is questionnaire distribution. This method is chosen because it makes easier for researcher to collect data, saving time, and shorten research time. The research result shows that according to contractor, productivity needs to be increase so that construction project quality also improve. According to contractor poit of view, technology can be used as a solution to increase productivity in construction project.
HYDRODYNAMIC ASSESMENT ON MOTION PERFORMANCE CHARACTERISTICS OF GENERIC WAVE ENERGY POINT ABSORBERS
This work condenses various modeling techniques for different Point Absorber configurations. An alternating frequency - time domain model is implemented in MatlabFORTRAN in order to compute the displacement, velocities a...
AN ANALYTICAL REVIEW STUDY ON BIG DATA ANALYSIS USING R STUDIO
A larger amount of data gives a better output but also working with it can become a challenge due to processing limitations. Nowadays companies are starting to realize the importance of using more data in order to suppor...
SUKUH TEMPLE IN KARANG ANYAR CENTRAL JAVA
In the Majapahit royal government all elements including culture in the lives of the people, such as sculpture, literary arts, and stage art must all be religious. One of the very unique and specific relics of the Majapa...
DELINEATION OF TARGET VOLUME FOR BRAIN TUMORS IN RADIOTHERAPY USING ACTIVE CONTOUR SEGMENTATION AND SIMPSON INTEGRATION
This research conducts the delineation process for a brain tumor on the radio therapy. Delineation means the imaging process of target volume that is conducted in the beginning of Treatment Planning System (TPS). Target...
STRUCTURAL AND DYNAMIC APPROACH TO ANALYZING THE ENERGY INTENSITY OF RUSSIAN REGIONS' GRP OVER THE PERIOD 2005-2014
Today, the Russian system of accounting energy consumption indicators is being actively developed, the special attention being paid to collecting verified statistical data and methodological grounding of energy efficienc...