Propagation Law of Blast-induced Vibrations during Metro Tunnel Under-passing Existing Old Buildings
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 4
Abstract
Objective There is limited research both in China and abroad on the blasting construction of metro tunnels under-crossing existing old buildings. Projects utilizing blasting excavation may pose safety concerns for nearby structures. It is crucial to understand the propagation law of blast-induced vibrations and analyze their impact on surrounding buildings. Method Taking the blasting construction of Nanping Sta.-Nanbin Road Sta. interval on Chongqing Rail Transit Line 10 phase II project as study case, the blast-induced vibrations are monitored during tunnel blasting excavation process. The observed data are obtained using sensors for blast-induced vibration, and regression analysis is performed on the actual blast-induced vibration monitoring data using the Sadowski′s formula, thus the propagation attenuation law of blast-induced vibrations is obtained, the influence of factors such as vibration velocity, maximum charge per delay, and blasthole distance on blast-induced vibrations is discussed. Result & Conclusion In the regression fitting results of blast-induced vibration velocity with blasthole distance and charge per delay in three vibration measurement directions, the correlation coefficients between calculated data and monitored data are all greater than 0.800. The increase in the maximum charge per delay is relatively small when the blasthole distance increases from 0 to 40 m. However, the increase in the maximum charge per delay becomes more significant when the blasthole distance ranges from 40 to 80 m. The variation amplitude is most significant in the direction perpendicular to tunnel bottom plate. Attention should be focused on the maximum allowable charge per delay value when the blast-induced vibration safety control velocity is set at 1.0 cm/s.
Authors and Affiliations
Shiliang GAO
Disturbance Deformation Influence and Field Measurement Study of Metro Shield Under-passing High Building Foundation
Objective With an increasing number of cases involving metro shield tunneling through or in proximity to high buildings in urban rail transit projects, the shield tunneling method inevitably causes disturbances to the gr...
Mechanism Analysis of Sand Splitting Grouting in Metro Tunnel
[Objective] In the process of grouting in metro tunnel, there exists dynamic coupling effect between sand stress field and slurry flow field. In order to improve the design level of metro tunnel sand grouting, it is nece...
Design and Applicability Analysis of Real-name Train-riding Scheme for City (Suburban) and Intercity Railways
Objective At present, there are no systematic research results on the real-name train-riding scheme yet for city (suburban) and intercity railways. Therefore, the implementation and construction of such system has no gui...
Construction Optimization of Shallow Railway Tunnels under Unsymmetrical Pressure for Reducing Blasting Over-excavation
Objective Over-excavation in tunnel construction, mainly caused by inappropriate blasting,will affect the smooth progress and safety of tunnel excavation, increase construction cost and reduce economic benefits. In order...
Approaches to Emergency Response Efficiency Enhancement in Urban Rail Transit FAO System
Objective The high level of automation and complexity in urban rail transit FAO (fully automatic operation) systems brings challenges in fault and emergency handling. Inefficient emergency response can lead to metro trai...