Proposal for a Reference Model for Sales & Operations Planning and Aggregate Planning

Abstract

Companies are increasingly adopting practices aimed at improving the quality of management, with the main purpose of enabling them to act competitively in the present market characterized by high competition and strong organizational changes. Among the improvements developed, we highlight the adoption of Enterprise Resource Planning (ERP) systems. However, the high cost of deploying and maintaining this type of technology can be a barrier for small and medium-sized enterprises (SMEs) that want to achieve such advances. Therefore, it is essential to develop a reference model of typical business planning modules to support ERP implementation, aiming at reducing time and cost in the elaboration of a particular model. In this context, the main objective of this paper is to develop a reference model from the elaboration of the processes related to Sales & Operations Planning (S&OP) and Aggregate Planning (AP), important modules of Production Planning and Control (PPC). The methodology used for the elaboration of this work was divided in eight sequential stages: study of the functions of S&OP and AP, study of process modeling area, definition of reference model processes, choice of modeling notation, choice of modeling tool , development of the reference model, software development and results analysis. The modeling methodology employed in this work was the Business Process Model and Notation (BPMN), through the tool Bizagi Process Modeler version 3.1.0.011. The software was developed through the interface Delphi version 7.0 (Object-Pascal language) in order to apply the reference model in the support to the implementation of a business management tool. As results, from a formal documentation, the reference model proved to be a useful tool in understanding and communicating the business processes raised. It is also concluded that the implemented model is able to support the implementation of production management systems in real situations.

Authors and Affiliations

Keywords

Related Articles

The Fishing Productivity Assessement Upstream and Downstream of Tucuruí Hydroeletric Dam, Tocantins-Araguaia basin, Brazil

The Tocantins-Araguaia basin is the second largest in Brazil and the most extensive in the drainage area totally placed in Brazilian territory. A time series of fishery production of more than 30 years of Tucuruí Hydroel...

Analysis of the Impact of Generation of Housing on the Performance of Soekarno-Hatta Street in Kasongan City

The purpose of this research is to analyze the effect of housing generation on the performance of Soekarno-Hatta Street in Kasongan City. The independent variable that is used as a factor that influences the generation i...

Payment for Environmental Services - An Example of Sustainable Management

The payment for environmental services presents itself as a potential instrument that promotes the sustainable development, which contributes to the preservation of nature in order to keep the maintenance of environmenta...

Monitoring of water Quality in the São João River Hydrographic Basin in the Municipality of Porto Nacional - Tocantins

The world today faces a major problem that is the pollution of water resources, occurring a huge loss of water quality. The quality monitoring is of utmost importance for obtaining physical, chemical, biological and ecol...

The Waste Management Plan and its Efficacy in an offshore Company

The study of this paper was carried out in a company that serves several platforms of Petrobrás, in Macaé-RJ, Rio de Janeiro State, Brazil, where it has maritime chamber services, including food, cleaning, cleaning and g...

Download PDF file
  • EP ID EP505642
  • DOI 10.22161/ijaers.5.8.34
  • Views 32
  • Downloads 0

How To Cite

(2018). Proposal for a Reference Model for Sales & Operations Planning and Aggregate Planning. International Journal of Advanced Engineering Research and Science, 5(8), -. https://europub.co.uk./articles/-A-505642