Abstract

Objective In recent years, extreme weather events and natural disasters increase and intensify frequently, and rainstorm-induced disasters in built urban rail transit and on-going foundation pit projects are causing significant and irreparable losses to the safety of passengers and social property. Thus, it is necessary to further enhance urban rail transit system flood prevention and disaster resistance capabilities. Method Taking the impact of Zhengzhou ′7·20′ Rainstorm on metro as a starting point, the evacuation schemes for train passengers during metro interval disasters are discussed and relevant suggestions are derived for the evacuation platform setup plan at critical parts of metro lines. Result & Conclusion It is suggested to adopt a through-type evacuation platform scheme between metro intervals and stations; interval connecting passage evacuation platform should adopt the through-type scheme and set up vertical steel ladders for connecting track bed and evacuation platform; small civil defense doors should be added at the civil defense partition doors on station end interval to connect the interval evacuation platform with the station equipment area platform board for facilitating passenger evacuation.

Authors and Affiliations

Zhengyi PAN

Keywords

Related Articles

Interlocking Interface Scheme for Urban Rail Transit Existing Depot Signaling System Renovation

Objective After reaching an operational lifespan, the signaling systems of existing urban rail transit lines need updating and renovation. A depot interlocking interface scheme should be developed to achieve a smooth tra...

Metro Vehicle Bogie Abnormal Vibration and Fatigue Failure

Objective Due to the increase of metro operation mileages and track conditions complexity, abnormal bogie vibrations caused by wheel-rail wear often occur. Bogie frame serves as an important load-bearing component, requi...

Influencing Factors of Shield Tunnel Segment Floating in Muddy Siltstone Stratum

Objective When shield tunnels crossing water-rich muddy siltstone stratum, the phenomenon of multi-ring tunnel segment overall floating often occurs, leading to quality defects such as segment damage, misalignment, and a...

PBA Construction Technology for Metro Station Expanding Excavation Undercrossing Parallel Existing Structure

Objective Affected by the occupation of existing buildings (structures) on the ground, the main retaining piles in shield receiving areas at both ends of some metro stations cannot be built. Therefore, it is necessary to...

Engineering Application of Calculation for Interval Protection Distance between Virtual Marshalling Trains in Urban Rail Transit

[Objective] The operation of virtual marshaling trains (abbreviated as V-train) in urban rail transit meets the construction requirements for green energy conservation and green intelligence integrated development proj...

Download PDF file
  • EP ID EP742717
  • DOI 10.16037/j.1007-869x.2024.08.046
  • Views 18
  • Downloads 0

How To Cite

Zhengyi PAN (2024). Reflection from Zhengzhou ′7·20′ Rainstorm towards Personnel Evacuation Platform Renovation Design in Metro Sections. Urban Mass Transit, 27(8), -. https://europub.co.uk./articles/-A-742717