Reliability Modeling and Analysis of a Parallel Unit System with Priority to Repair over Replacement Subject to Maximum Operation and Repair Times
Journal Title: International Journal of Trend in Scientific Research and Development - Year 2018, Vol 2, Issue 5
Abstract
This paper proposes the study of modelling and analysis of a two unit parallel system. A constant failure rate is considered for the units which are identical in nature. All repair activities like repair, replacement, preventive maintenance are mended immediately by a single server. The repair of the unit is done after its failure and if the fault is not rectified by the server within a given repair time, called maximum repair time, the unit replaced by new one. And, if there is no fault occurs up to a pre-fixed operation time, called maximum operation time, the unit undergoes for the preventive maintenance. The unit works as new after all repair activities done by the server. Priority to repair of one unit is given over the replacement of the other one. All random variables are statistically independent. The distribution for the failure, preventive maintenance and replacement rates are negative exponential whereas the distribution for all repair activities are taken as arbitrary with different probability density functions. Semi-Markov and regenerative point techniques are used to derive some reliability measures in steady state. The variation of MTSF, availability and profit function has been observed graphically for various parameters and costs. Reetu Rathee | S. C. Malik | D. Pawar"Reliability Modeling and Analysis of a Parallel Unit System with Priority to Repair over Replacement Subject to Maximum Operation and Repair Times" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-2 | Issue-5 , August 2018, URL: http://www.ijtsrd.com/papers/ijtsrd15655.pdf http://www.ijtsrd.com/mathemetics/statistics/15655/reliability-modeling-and-analysis-of-a-parallel-unit-system-with-priority-to-repair-over-replacement-subject-to-maximum-operation-and-repair-times/reetu-rathee
Gas Bubble Tracking During Casting Filling Process
During numerical simulation, one of the biggest challenges is to simulate the smallest air bubbles that can be entrained in the metal. In fact, in common fluid dynamic simulation of casting process filling each time a re...
Design of High Strength Concrete Using Superplastisizer and Stone Dust
Concrete is the most widely used construction material today. Increase in construction activities have led to an increase in demand for the various raw materials in concrete, especially river sand which is the convention...
Effect of Operating Temperatures on the Performance of a SOFC GT Hybrid System
This article presents a steady state thermodynamic model of a solid oxide fuel cell gas turbine hybrid cycle which developed by using a simulation software, MATLAB®. The hybrid model integrates a zero dimensional level...
Strum Liouville Problems in Eigenvalues and Eigenfunctions
This paper we discusses with Strum Liouville problem of eigenvalues and eigenfunctions, within the standard equation where p,q and r are given functions of the independent variable x is an interval The is a parameter and...
Design and Construction of a 0.75KVA Inverter Power Supply for Nigerian Homes and Offices
Over the years, there have been a gradual increase in the electricity generation capacity of Nigeria, with more gas power plants installed between 1999 2003 to augment power supply from the existing hydro and thermal pow...