Remaining Life Assessment of Kotabaru 2x7 MW Coal Fired Power Plant Circulating Water A252 Gr 2 Intake Pipe by Inspection Method

Journal Title: International Journal of Current Science Research and Review - Year 2024, Vol 7, Issue 05

Abstract

Kotabaru power plant is a power plant that was built in 2010 and currently the construction work is pending. The construction work stopped in 2014 and based on Kotabaru power plant construction final quantity report, Kotabaru construction work progress is 79,61% up to now. Kotabaru power plant uses open cooling system and takes seawater as cooling water resources. The seawater distribute through intake pipeline which use A252 grade 2 material 600 mm and 800 mm diameter pipeline with 3PL coating and rubber lining inside the pipe. The pipeline distribute the water in 3.184.739 kg/hr flow rate and 5 kg/cm2 G pressure. These pipeline material was on site in 2013 and it was not constructed yet. In 2022 Kotabaru power plant is planned to continue the construction work progress. It was about 9 years of pipeline material on Kotabaru power plant site and these pipeline is exposed to the environment such as sunlight, temperature, oxygen, water, and contaminants and cause a primer failure, especially ultraviolet light (UV) from the sunlight is the main damaging factor. Ultraviolet light from sunlight is high enough to break the coating of pipeline. Inspection and assess the pipeline can help the management to figure out pipeline actual condition. More effective inspections can reduce the risk level by reducing the frequency of future failures, through corrective and preventive action. In general, the purpose of this method is classify all risk level equipment, calculate the risk value of all equipment and it can help to make a decision to the next construction period. The service lifetime of pipeline prediction can be determined by actual pipe condition by use corrosion test and actual thickness dimension of the pipeline. This method will inform the life time prediction of the pipeline that should be meet the 15 years life time required and also inform the risk matrix value of all pipeline equipment on the site.

Authors and Affiliations

Hafidz Nufi Hartanto , Agus Suprihanto, Gunawan Dwi Haryadi,

Keywords

Related Articles

A Review on the Prevalence and Management of Colorectal Cancer

Cancer had become a common disease worldwide and cancer related death is also increasing in various parts of the world in spite of increased screening and diagnostic facilities available for early detection of cancer and...

Driving Business Growth through Data Decision Making: The Role of Marketing Automation

The business landscape has transformed significantly with the abundance of information and rapid technological advances, creating numerous opportunities for data-driven decision-making to foster company growth. This rese...

Politics of Mining: Ecological and Economic Dynamics in Maluku Utara

The mining issue in North Maluku Province has become a primary focus, resulting in serious impacts on the economic and investment climate. Challenges related to mining activities include environmental damage, pollution,...

Moderation of Life Style on the Influence of Financial Literacy and Self-Control on the Saving Behavior of Millennial Employees in Denpasar City

This study aims to analyze the influence of financial literacy and self-control on the saving behavior of millennial employees, as well as the moderating role of lifestyle in the relationship. Financial literacy, which i...

Analysis of Risk Factors for Death in COVID-19 Patients at Bahteramas Regional General Hospital, Southeast Sulawesi Province

Background: Coronavirus disease 2019, or COVID-19, is an infectious disease caused by the Severe Acute Respiratory Syndrome Coronavirus 2 (SARS-CoV-2). COVID-19 has been classified as a pandemic since 2020. Purpose:...

Download PDF file
  • EP ID EP735600
  • DOI 10.47191/ijcsrr/V7-i5-60
  • Views 36
  • Downloads 1

How To Cite

Hafidz Nufi Hartanto, Agus Suprihanto, Gunawan Dwi Haryadi, (2024). Remaining Life Assessment of Kotabaru 2x7 MW Coal Fired Power Plant Circulating Water A252 Gr 2 Intake Pipe by Inspection Method. International Journal of Current Science Research and Review, 7(05), -. https://europub.co.uk./articles/-A-735600