Research on Degraded Operation Scheme of Train Autonomous Control System Based on Vehicle-to-vehicle Communication
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 9
Abstract
Objective As a new generation of train control system, the TACS (train autonomous control system)based on vehicle-to-vehicle communication is significantly different from CBTC (communication-based train control) in system architecture. It is necessary to conduct a research on the degraded operation scheme of TACS in the event of equipment failure to ensure safe and reliable train operation. Method The characteristics of TACS based on vehicle-to-vehicle communication is elaborated and analyzed, and its architecture is introduced. The degraded operation requirements of TACS are analyzed, and a degraded operation scheme of TACS based on multi-sensor fusion technology of 'radar plus visual method' is proposed. Result & Conclusion The above degraded operation scheme can effectively solve problems such as train speed measuring, positioning, and interval protection, and effectively detect foreign object intrusion in the track area.
Authors and Affiliations
Shiyong DU, Guoping FU, Ying HU
Development Course Overview and Future Prospect of Road Rubber-tyred Guidance System
Objective Road rubber-tyred guidance system is officially launched for operation in some cities worldwide. To gain a more detailed and comprehensive understanding of this system, it is necessary to systematically summari...
Collaborative Control of Virtual Formation Trains Based on Event Triggering Mechanism
[Objective] In order to improve the transportation capacity of railway lines, make the trains form a stable virtual formation within the interval, and reduce the communication pressure during the entire marshaling proc...
Docking Scheme of Shanghai Rail Transit Technical Security System with External Systems
Objective To meet the requirements of external entities for accessing video surveillance images from Shanghai rail transit system, and to ensure the normal, stable and secure transmission of these images, it is necessary...
Muck Improvement Experiment of Earth Pressure Balance Shield Tunnel in Water-rich Sand Layer Based on Pressure Transfer Characteristic
Objective Due to the characteristics of strong permeability and high water content in water-rich sand layer, the poor muck improvement can easily cause accidents such as spout spilling of screw conveyor and mud cake form...
Key Issues in Rail Transit Four-network Integration Planning
[Objective] Advancing urban rail transit four networks (mainline railways, intercity railways, suburban railways, and urban rail transit) integration is an urgent need for China to promote new urbanization with metropo...