RESOURCES OPTIMIZATION IN CASTING OF SEGMENTS ON BRIDGE CONSTRUCTION

Abstract

Resources are the most important part of any construction project. Total cost of project is based on resources. For India the construction industry has contributed an estimated 6708 billion to the national GDP in 2011-12 which is a share of around 8%. This sector is both labour and machine intensive and provides employment to more than 35 million people, which is around 27% population of India. So, optimization of resources plays a vital role in saving of valuable natural resources and cost which is required to generate them. So, in this paper concept of optimization is understood clearly and try to implement it on bridge construction site. The case study is selected as Hyderabad metro project. In this project concreting of precast segment of bridge is considered. The main objective of study is to optimize the resource utilization on concreting activity by applying some operational research techniques such as transportation model, assignment model, EOQ etc. The paper also discussed the concept of multi agent negotiation used on site. Construction projects are unique in nature because construction activities are varies from project to project. Thus, it is not possible to apply result of optimization from any particular case study to any other construction site but the idea or technique regarding optimization till remains same for other sites.

Authors and Affiliations

Abhaysinha G. Shelake

Keywords

Related Articles

 Analysis of Hyper Spectral Image and Compression Algorithm Parameters

 Hyper Spectral imaging is similar to spectral imaging where information is collected and processed across the electromagnetic spectrum. Information’s are retrieved in the form of images/bands. Since images are col...

 EVOLUTIONARY METHODS FOR IMAGE CLASSIFICATION: A REVIEW

 Image classification has earned enormous attention due to the advent of modern day applications involving image base information and now an extensive research has been carried out in this field. It is important to...

 Rice Genomes Classification based on Efficient Distance Measures Classifiers

 The structure and composition of genomes is swiftly systematic in pace with their sequencing. The promising data show that a significant portion of Rice genomes is composed of transposable elements. Given the prof...

 LOW COMPLEXITY ALGORITHM FOR EXTRACTION OF ECG FIDUCIAL POINTS

 An automated algorithm for detection of fiducial points from the electrocardiogram (ECG) and identification of its various morphologies is proposed in this work. The application area we consider is that of remote...

 A NEW SYSTEM FOR INSERTING A MARK PATTERN INTO H264 VIDEO

 Watermarking seems to be an exclusive method to discourage the illegal content sharing. This Watermarking officially selected as a requirement to be able to redistribute Hollywood movies Error! Reference sourc...

Download PDF file
  • EP ID EP106049
  • DOI -
  • Views 80
  • Downloads 0

How To Cite

Abhaysinha G. Shelake (30). RESOURCES OPTIMIZATION IN CASTING OF SEGMENTS ON BRIDGE CONSTRUCTION. International Journal of Engineering Sciences & Research Technology, 4(6), 8-17. https://europub.co.uk./articles/-A-106049