SELECTION OF COMPENSATION WIND FARM EQUIPMENT CONNECTED TO THE NETWORK 110 KV

Abstract

Wind energy in Poland began to develop in the early 90s of the twentieth century, but its dynamic growth can be observed in subsequent years. At the end of 2014, the total installed capacity in wind farms in Poland amounted to 3 800 MW and continues to grow. The construction and installation of wind farms with high power brings with it a number of problems related to the compensation of the 110 kV cable lines of considerable length and the right type of compensation equipment. The article describes issues related to regulation of reactive power in wind farms and an analysis of individual compensation equipment used in wind energy.

Authors and Affiliations

Paweł Pijarski, Michalina Gryniewicz-Jaworska

Keywords

Related Articles

WPŁYW WYSOKIEGO NAPIĘCIA NA ROZWÓJ TKANKI ROŚLINNEJ

W naszym eksperymencie badane były parametry elektryczne, które wpływają na wczesne zarodki somatyczne (ESE). Wysokie napięcie wytworzono za pomocą specjalnego generatora. Wysokie napięcie, z przedziału od 5 do 20 kV i c...

INFORMATION TECHNOLOGIES FOR THE ANALYSIS OF THE STRUCTURAL CHANGES IN THE PROCESS OF IDIOPATHIC MACULAR RUPTURE DIAGNOSTICS

Process of eye tomogram obtaining by means of optical coherent tomography is studied.Stages of idiopathic macula holes formation in the process of eye grounds diagnostics are considered. Main stages of retina pathology p...

PORÓWNANIE METOD UŚREDNIANIA STATYSTYCZNEGO NA PRZYKŁADZIE WZORCOWANIA CEWEK HELMHOLTZA

Podczas wzorcowania cewek Helmholtza podczas których mierzy się bezpośrednio więcej niż jeden parametr możliwe są różne podejścia do uśredniania statystycznego. W pracy omówione będą dwa z nich: uśrednianie na począ...

3D Numerical Study of Wire-Cylinder Precipitator for Collecting Ultrafine Particles from Diesel Exhaust

A precipitator section is modeled numerically in 3D to determine the collection efficiency for diesel exhaust particulates. It consists of a circular tube and a wire electrode mounted at the center of the tube, supplied...

RELIABILITY ANALYSIS OF PWR REACTOR PROTECTION SYSTEM

The aim of this work was to assess the probability of the Westinghouse PWR reactor protection system (RPS) unavailability. The reference facility for which the analysis has been made was Surry Nuclear Power Plant located...

Download PDF file
  • EP ID EP81438
  • DOI -
  • Views 113
  • Downloads 0

How To Cite

Paweł Pijarski, Michalina Gryniewicz-Jaworska (2016). SELECTION OF COMPENSATION WIND FARM EQUIPMENT CONNECTED TO THE NETWORK 110 KV. Informatyka Automatyka Pomiary w Gospodarce i Ochronie Środowiska, 6(1), 47-50. https://europub.co.uk./articles/-A-81438