Objective Beidi Road Depot of Shanghai Rail Transit Line 13 is undergoing an upgrade from a conventional interlocking system to CBTC (communication-based train control) system. This upgrade is characterized by a short nighttime commissioning period, numerous reverse-connection equipment, and stringent safety requirements. To meet the demands of signaling system retrofit and commissioning, it is essential to explore a suitable reverse-connecting scheme. Method A detailed reverse-connection scheme for signal machine, axle counter device, turnout switch machine, and communication network equipment is provided, focusing on the reverse-connection processes for reusable turnout switch machines on existing lines, indoor communication network devices, and trackside wireless access points. Result & Conclusion During non-commissioning periods, all newly added train and shunting signal machines and axle counter devices must be powered down. The railway signal AX series relays are used as a reversing device for large DC turnouts. SDH (synchronous digital hierarchy) equipment cannot be removed directly. The newly installed industrial Ethernet switch machine can only be integrated as a subnet device into the backbone network, maintaining its connection until the completion of the SDH network retrofit. And then the industrial Ethernet switch machines are connected to the retrofitted mainline communication network. The existing trackside AP (access point) devices can be connected in batches with the new signal rooms to avoid a complete simultaneous cutover, thus reducing construction difficulty and risk.

Authors and Affiliations

Haiping CHU, Kehan SUN

Keywords

Related Articles

Adhesion Control Method for EMU

Objective Given the high operating speeds, minimal residual acceleration margin, and open-air track conditions of EMU (electric multiple units), as well as the deficiencies in conventional combination correction methods...

Recommendations for Passenger Flow Demand-oriented City Railway Transportation Organization Optimization under Four-network Integration

Objective The construction of regional integration places higher demands on the integrated development of multi-level rail transit networks in the region. Following the trend of four-network integration, it is crucial to...

Prediction of Excavation Disturbance and Required Support Force for Tunnel beneath Existing Structural Foundations

[Objective] It is inevitable that construction of new tunnels or other underground engineering projects will pass through some building structures, causing disturbances to the existing structural foundations. Therefore,...

Prediction Model of Metro Traction Power Consumption Based on Grey Neural Network

Objective In order to improve train operational efficiency, it is necessary to monitor metro traction power consumption and establish a relevant energy consumption model for prediction analysis of metro traction power co...

Calculation of Shield Tunneling Response Based on Subloading Cam-Clay Model

[Objective] During shield tunneling in water-rich soft strata, ground deformation is often influenced by the combined effects of soil strength, deformation, and permeability characteristics. The time effect caused by p...

Download PDF file
  • EP ID EP751196
  • DOI 10.16037/j.1007-869x.2024.11.023
  • Views 21
  • Downloads 0

How To Cite

Haiping CHU, Kehan SUN (2024). Signaling System Retrofit and Reverse-connection Scheme for Shanghai Rail Transit Line 13 Beidi Road Depot. Urban Mass Transit, 27(11), -. https://europub.co.uk./articles/-A-751196