Objective To prevent water leakage issues in large-diameter shield tunnel, ensure high-speed train operational safety and normal tunnel functionality, it is necessary to carry out analysis and research on tunnel segment joint deformation and waterproof performance under high-speed train vibration. Method Relying on the Zhanjiang Bay Subsea Tunnel project, a soil-tunnel three-dimensional model and a sealing gasket-groove two-dimensional refined model are established using finite element software. First, the dynamics response and deformation characteristics of segment joints under high-speed train vibration in large-diameter shield tunnel are studied, with longitudinal joints as example. Then, the waterproof performance of a sealing gasket is analyzed based on the most adverse joint deformation working condition. Result & Conclusion The research results indicate that under the vibration of a single high-speed train, the displacement response process of segment joints can be divided into three stages: deformation increase, deformation being danger, and deformation decline. During the second stage, significant joint opening and misalignment occur at the upper part and both ends of the segment ring, while adjacent joints experience reduced opening and misalignment due to compression from both adjacent side segments. There is almost no deformation at the joints below the track bed, as the tunnel track bed significantly mitigates the impact of train vibration on segment linings. The contact stress between sealing gaskets follows a U-shaped distribution, decreasing from the central contact area towards both edges between the sealing gasket and the segment groove. Leakage is more likely to occur at the contact surfaces between the sealing gaskets than along the contact path between the sealing gasket and the segment groove. Under the most adverse working condition of this project, a provided triangular perforated sealing gasket is found to meet the tunnel waterproof requirements.

Authors and Affiliations

Jiajun DU, Yue WU, Changqing ZHENG, Chun QI, Yongpeng HUO, Qixiang YAN

Keywords

Related Articles

Empirical Analysis of Ultra-peak Coefficient of Inbound Passenger Flow in Guangzhou Metro Station

[Objective] Ultra-peak passenger flow is an important parameter for designing the capacity of various parts in urban rail transit station, which is obtained by multiplying the peak-hour passenger flow by the ultra-peak c...

Assessment and Optimization Strategies of Tram Station Environment Based on Park City Scene Creation

Objective In the development context of ecological construction and new urbanization for park cities in the current new-era, the main theme is to explore the planning direction and influencing factors of urban new scene...

Theoretical Study on the Relationship between Stiffness and Modal of Railway Passenger Car Bodies

[Objective] To analyze the relationship between carbody stiffness and modal, and to provide theoretical support for the modal analysis of lightweight carbodies, it is necessary to conduct a theoretical study on both as...

Fault Diagnosis and Prediction Method for Platform Door Self-holding Electromagnetic Lock System Based on Standard Deviation of Electromagnetic Circuit Current Value

Objective Platform door EL (electromagnetic lock) is one of the key components of platform doors in urban rail transit station. EL malfunctioning shall directly affect line operation safety and the normal passage of pass...

Research and Application of City (Suburban) Railway Post-station Fully Automatic Turn-back Method

Objective CTCS2+ATO (Chinese Train Control System Level 2 + Automatic Train Operation) system can meet the requirements for cross-line operation between city (suburban) railway and national mainline and intercity railway...

Download PDF file
  • EP ID EP742701
  • DOI 10.16037/j.1007-869x.2024.08.030
  • Views 34
  • Downloads 0

How To Cite

Jiajun DU, Yue WU, Changqing ZHENG, Chun QI, Yongpeng HUO, Qixiang YAN (2024). Simulation Analysis of Segment Joint Deformation and Waterproof Performance under High-speed Train Vibration in Large-diameter Shield Tunnel. Urban Mass Transit, 27(8), -. https://europub.co.uk./articles/-A-742701