Abstract

Objective To prevent water leakage issues in large-diameter shield tunnel, ensure high-speed train operational safety and normal tunnel functionality, it is necessary to carry out analysis and research on tunnel segment joint deformation and waterproof performance under high-speed train vibration. Method Relying on the Zhanjiang Bay Subsea Tunnel project, a soil-tunnel three-dimensional model and a sealing gasket-groove two-dimensional refined model are established using finite element software. First, the dynamics response and deformation characteristics of segment joints under high-speed train vibration in large-diameter shield tunnel are studied, with longitudinal joints as example. Then, the waterproof performance of a sealing gasket is analyzed based on the most adverse joint deformation working condition. Result & Conclusion The research results indicate that under the vibration of a single high-speed train, the displacement response process of segment joints can be divided into three stages: deformation increase, deformation being danger, and deformation decline. During the second stage, significant joint opening and misalignment occur at the upper part and both ends of the segment ring, while adjacent joints experience reduced opening and misalignment due to compression from both adjacent side segments. There is almost no deformation at the joints below the track bed, as the tunnel track bed significantly mitigates the impact of train vibration on segment linings. The contact stress between sealing gaskets follows a U-shaped distribution, decreasing from the central contact area towards both edges between the sealing gasket and the segment groove. Leakage is more likely to occur at the contact surfaces between the sealing gaskets than along the contact path between the sealing gasket and the segment groove. Under the most adverse working condition of this project, a provided triangular perforated sealing gasket is found to meet the tunnel waterproof requirements.

Authors and Affiliations

Jiajun DU, Yue WU, Changqing ZHENG, Chun QI, Yongpeng HUO, Qixiang YAN

Keywords

Related Articles

Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4

Objective During the evolution of existing DCS (data communication subsystem) towards a dual-mode four-network system in the major signaling system renovation project of Shanghai Rail Transit Line 3 and Line 4, there is...

Analysis of Application Cases of Foreign Re-coupling Marshalling Operation Organization Modes and Implications for Urban Rail Transit Operation Organization in China

[Objective] Against the backdrop of the increasingly evident temporal and spatial imbalance of passenger flows in urban rail transit, it is difficult for the existing operation organization mode to adapt to the complex...

Influence Law of Urban Shallow-buried Tunnel Buried Depth on Land Subsidence

Objective The buried depth of tunnel is one of the important factors contributing to land subsidence induced by tunnel construction, especially in urban underground space where subtle environmental changes are prone to c...

Simulation Analysis of Jet Noise from High-speed Railway EMU Main Circuit Breaker Switching Valve and Noise Reduction Measures

Objective The jet noise generated by the main circuit breaker switching valve of high-speed railway EMU is excessively high, which seriously affects passenger comfort. Therefore, it is essential to study effective noise...

Structural Renovation Design Study for Shanghai Rail Transit Line 3/4 Joint-rail Project at Baoshan Road Station

[Objective] To enhance train throughput capacity and reduce safety risk at Baoshan Road Station in Shanghai rail transit, a track joint-rail renovation is necessary, requiring concurrent reinforcement of station structur...

Download PDF file
  • EP ID EP742701
  • DOI 10.16037/j.1007-869x.2024.08.030
  • Views 33
  • Downloads 0

How To Cite

Jiajun DU, Yue WU, Changqing ZHENG, Chun QI, Yongpeng HUO, Qixiang YAN (2024). Simulation Analysis of Segment Joint Deformation and Waterproof Performance under High-speed Train Vibration in Large-diameter Shield Tunnel. Urban Mass Transit, 27(8), -. https://europub.co.uk./articles/-A-742701