Abstract

The success rate of software projects is still not at the desired level despite of the technological advances. The vast majority of software projects can not be delivered at the desired specifications or can be delivered beyond the planned budget and time. The software project schedule is one of the important factors that influence this success. Due to it includes parameters such as human resource, time, cost, and process sequence of activities, state space is too big for software project scheduling. So it is difficult to create a software project schedule for software project managers. In this study, using human resource and activities these resource can do, it is tried to obtain minimum project completion time while creating software project schedule using ant colony and artificial bee colony optimization algorithm and results are analyzed. According the results obtained, both methods are successful in software project scheduling. Although the processing time of the artificial bee colony algorithm is slower than ant colony optimization algorithm, it has been determined that when the number of colony / food source is increased, it is converged to minimum project completion time faster than the ant colony algorithm.

Authors and Affiliations

Keywords

Related Articles

Şehir İçi Ulaşımda Toplu Taşıma Araçlarının Seçiminin AHP Ve VIKOR Teknikleri İle Çok Kriterli Modellenmesi

Toplu ulaşım problemlerinde doğru kaynakların doğru bir şekilde atanması günümüzde önem arz etmektedir. Toplu ulaşım araçlarının seçiminde baz alınan kriterlere en uygun aracın seçimi süreci; yerel yönetimler açısından ö...

Analysis of Electrical Load Forecasting Methods

The importance of the energy demand sustains its rising in parallel with increasing population, urbanization, proliferation of industry and technology. A large part of the energy consists of electrical energy. The load f...

An Expert System Selected Insert Cutting Tools in Machining Of the Screws

Generally, the screwed fasteners are used to assemble the machine parts. The screwed method is one of the basic machining operations. The screwed geometry is of critical importance. The screws are manufactured for differ...

Proposal Of Green Building Performance Measurement Model For Shopping Malls

Competition in shopping malls, which have an important place in our social life, is increasing day by day.In such an atmosphere, performance evaluation of shopping centers in terms of economic, social and environmental a...

LED Işık Kaynaklı, Enerji Tasarruflu ve Yüksek Verimli Ofis Aydınlatma Armatürü Tasarımı

Son yıllarda, tüm dünyada enerji verimliliğinin artan önemi sonucunda, aydınlatmada verim konusunda da bilinç ve çalışmalar artmış, LED aydınlatmaya geçiş başlamıştır. Dünyadaki gidişat diğer teknolojilerde olduğu gibi a...

Download PDF file
  • EP ID EP530075
  • DOI -
  • Views 65
  • Downloads 0

How To Cite

(2018). Software Project Scheduling Using Ant Colony and Artificial Bee Colony Algorithm. Gazi Mühendislik Bilimleri Dergisi, 4(2), -. https://europub.co.uk./articles/-A-530075